Headend Equipment Installation & Powering; Headend Equipment Installation - Lencore Spectra i.Net Installation And Operation Manual

Hide thumbs Also See for Spectra i.Net:
Table of Contents

Advertisement

section 6
6.1 | head end equipment installation
HEAD END EQUIPMENT LIST:
i.LON®
Music and Paging Interface (optional)
SmartSwitch (optional)
Jordna Hub
FT Terminator (optional)
Mic Pre-Amp (Optional equipment)
320 watt, 48V Power supply
For SmartSwitch and first i.Net OP
For Mic Pre-Amp (optional)
1
Electrical Requirements:
a
Installing Head End Equipment (Din Rail and i.LON) (This may already be pre-wired)
2
One dedicated 120v/20 Amp circuit is suggested for the Lencore branded enclosure
NOTE: Never use a ground lifter. Always use a proper three prong adapter for safety.
WARNING
39

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Spectra i.Net and is the answer not in the manual?

Table of Contents