Site Requirements - Malvern Zetasizer Nano series Self Installation And Quick Start Manual

Zetasizer nano series
Hide thumbs Also See for Zetasizer Nano series:
Table of Contents

Advertisement

Part 1: Setting up
the Zetasizer Nano
1. Introduction
Work through this section to set the instrument up. The other sections show how to make the initial test
measurement, then your own measurements in future.
Never lift the instrument by its covers.

2. Site requirements

The site must be:
Indoors and away from strong light (avoid windows).
Away from heat sources like radiators.
On a horizontal vibration-free bench.
Well ventilated (if measuring noxious materials).
Allow space for the instrument as shown below (the Essentials Manual gives the full requirements):
ill 7929
800 mm
1
Always stand it on its feet, not its side.
ill 7930
ill 7931

Advertisement

Table of Contents
loading

Table of Contents