3.4

Installation of the Vessel

1.
Make sure the pool pump is turned off.
2.
Remove the temporary cap on the cartridge side of the vessel, and install the Nature
in the box. Do not throw out the cap. It will be used for winterization of the system.
3.
Locate a suitable section of pipe to install the vessel, approximately 17" (43 cm) long, that conforms to the
installation requirements outlined in Section 3.2.
" (35 cm) section of the 2" (5 cm) pipe to insert the vessel (see Figure 3).
4.
Cut out a 13
/
7
8
5.
Connect the outlet from the fi lter or heater to the vessel inlet port with the appropriate Schedule 40 PVC pipe;
secure the connection with a pipe glue that is compatible with PVC.
NOTE Reducer bushings can be used to accommodate 1.5" (3.8 cm) plumbing with no effect on the
operation of the Nature
6.
Connect the vessel outlet port to the pool return line with the same type of PVC pipe and secure the connection
with pipe glue. Allow suffi cient time for the glue to dry.
7.
Hand tighten all unions, sensors, and collars.
Be careful not to get fi nger caught between inlet union and plug when tightening as this may cause an injury.
8.
Start the pump and check for leaks.
Flow
Outlet
Figure 3.
Pipe Cutout
Nature
Fusion Soft Installation and Operation Manual
2
Fusion Soft.
A
Flow
Flow/Temperature/
Salinity Sensor
CAUTION
Universal Unions and Nuts
for Inlet and Oulet ports
Inlet
A
"
For a 2
(5 cm) i e the cutout is 13
with the full unions.
NOTE Total length of the Nature
with the full unions is 16
2
start-up cartridge included
"
(35 cm)
2
Fusion vessel
"
(42 cm).

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Nature2 Fusion soft and is the answer not in the manual?

Table of Contents

Save PDF