Demand and Emergency Stop Settings
1.
Press the DEMAND & EMERGENCY STOP SETTING button on the MAINTENANCE MENU screen.
(2).
Press the SET button.
Pressing the SET button applies the setting.
(3).
RUN SCHEDULE after releasing the Emergency Stop. (Factory default: INVALID)
You can valid or invalid running the schedule of the day after emergency stop is released.
(4).
RUN SCHEDULE after releasing the Demand control. (Factory default: INVALID)
You can valid or invalid running the schedule of the day after the demand operation is released.
(5).
RUN SCHEDULE in Demand control. (Factory default: VALID)
You can valid or invalid running the schedule during the demand operation.
(3)
(4)
(5)
(2)
– 43 –