Hitachi Compute Blade 2500 Getting Started Manual page 43

Hide thumbs Also See for Compute Blade 2500:
Table of Contents

Advertisement

Symbol
Note:
1
After the power is turned on, this lamp might turn on. This state occurs during
.
the initialization process, and does not indicate a problem if the light turns off
after about one minute. If the lamp does not turn off, contact your reseller or
call maintenance personnel.
2
USB port
.
These ports are for mounting USB devices.
3
NMI reset switch
.
This switch resets the server blade. An NMI is issued for the operating
system running on the server blade.
4
KVM
.
A KVM port. By connecting an optional KVM cable, VGA output and a
serial port and USB port are available.
5
Power switch
.
This is the power switch of the server blade. Use this switch to manually
power on or power off the server blade. To force the operating system on
the server blade to shut down, press and hold this power switch for more
than 4 seconds, which turns the power off. Never press the power switch
when the operating system on the server blade is running correctly. If
you do so, the operating system might not start or data might be
corrupted.
This power switch has a green LED to indicate the power and operation
statuses. The behavior of the LED in relation to the operational status of
the server blade is as shown below.
Fast flashing
¢
The server blade was inserted into the server chassis for the first
time, and the BMC of the server blade is being initialized.
Slow flashing
¢
The BMC has been initialized and the server blade has been powered
off.
Light on
¢
The server blade is powered on.
Light off
¢
The server blade is powered off.
Hitachi Compute Blade 2500 Series Getting Started Guide
Name
State
Flashing orange
CB 2500 Appearance
Description
The drive is being rebuilt
(target drive).
2-7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents