koppel KV24 ODU-ARF21C Service Manual page 83

Light commercial air conditioning
Table of Contents

Advertisement

5.2.5 Insulate the copper pipe
Before test operation, the joint parts should not be heat insulated.
5.2.6 Flare the pipe
Insert a flare nut into the pipe before flaring the pipe
According to the following table to flare the pipe
Pipe diameter
1/4" (6.35)
3/8" (9.52)
1/2" (12.7)
5/8" (15.9)
3/4" (19)
After flared the pipe, the opening part must be seal by end cover or adhesive tape to avoid duct or
exogenous impurity come into the pipe.
5.2.7 Drill holes if the pipes need to pass the wall.
5.2.8 According to the field condition to bend the pipes so that it can pass the wall smoothly.
5.2.9 Bind and wrap the wire together with the insulated pipe if necessary.
5.2.10 Set the wall conduit
5.2.11 Set the supporter for the pipe.
5.2.12 Locate the pipe and fix it by supporter
For horizontal refrigerant pipe, the distance between supporters should not be exceed 1m.
For vertical refrigerant pipe, the distance between supporters should not be exceed 1.5m.
5.2.13 Connect the pipe to indoor unit and outdoor unit by using two spanners.
Be sure to use two spanners and proper torque to fasten the nut, too large torque will damage the
bellmouthing, and too small torque may cause leakage. Refer the following table for different pipe
connection.
Pipe Diameter
(kgf.cm)
1/4" (6.35)
144~176
3/8" (9.52)
333~407
1/2" (12.7)
504~616
5/8" (15.9)
630~770
3/4" (19)
990~1210
Installation
Lean
Flare dimension A (mm)
Min
Max
8.3
8.7
12.0
12.4
15.4
15.8
18.6
19.1
22.9
23.3
Torque
(N.cm)
1420~1720
3270~3990
4950~6030
6180~7540
9270~11860
Crude
Burr
Flare shape
Sketch map
Refrigerant pipe installation
- +
90 ° 4
A
R0.4~0.8
81

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kv36 odu-arf21cKv48 odu-arf21cKv60 odu-crf21c

Table of Contents