Fluid Cooler Installation - SPX Cooling Technologies MH Fluid Cooler User Manual

Fluid cooler
Table of Contents

Advertisement

Warning
Note
6
installation
Hoisting clips are provided for ease of unloading and positioning
the fluid cooler. For overhead lifts or where additional safety is
required, safety slings should also be placed under the fluid cooler
modules. Under no circumstances should you combine the top and
bottom modules of modular models and attempt to hoist them at
the same time by utilizing the hoisting clips alone!
SINGLE FLOW FLUID COOLER SHOWN

Fluid Cooler Installation

These installation instructions are intended to help you prepare
before your fluid cooler arrives. If discrepancies exist between
these instructions and those shipped with the fluid cooler, the
instructions shipped with the fluid cooler will govern.
1. Prior to placement of the fluid cooler, confirm that the supporting platform
is level, and that the anchor bolt holes are correctly located in accordance
with Marley drawings. If your installation uses vibration isolators to dampen
vibration, they must mounted below the supporting steel. See support
drawings for further information.
2. Place bottom module on your prepared supports, aligning anchor bolt
holes with those in your supporting steel. Make sure that the orientation
agrees with your intended piping arrangement. Attach fluid cooler to sup-
porting steel with M16 bolts and flat washers (by others). See support
drawing for location and quantity. Position flat washers between the bolt
head and the fluid cooler basin flange.
OFFSET REQUIRED FOR
BALANCED LIFT
C L
C L

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents