INSTALL CIRCUIT BREAKER HANDLE EXTENSION
(FIG. 36) — Unit-mounted Standard Tier Frame E765-E1530
and LF2 Frame 900-1169 Amp VFDs are shipped with handle
extension for the VFD main circuit breaker strapped to the
VFD mounting frame. This handle extension must be installed
by sliding the clip over the circuit breaker handle (Fig. 37).
a19-2076
Fig. 36 — Circuit Breaker Handle Extension
Fig. 37 — Circuit Breaker Handle Extension Installed
Step 6 — Make Electrical Connections —
wiring must be installed in accordance with job wiring dia-
grams and all applicable electrical codes.
Do not run 120-v wiring into the control cabinet. The con-
trol cabinet should only be used for additional extra-low
voltage wiring (50 v maximum). Damage to machine could
result.
Wiring diagrams in this publication (Fig. 38-40) are for ref-
erence only and are not intended for use during actual installa-
tion; follow job specific wiring diagrams.
Do not attempt to start compressor or oil pump (even for a
rotation check) or apply test voltage of any kind while
either chiller module is under dehydration vacuum. Motor
insulation breakdown and serious damage may result.
CONNECT CONTROL INPUTS — Wiring may be speci-
fied for a spare safety switch, and a remote start/stop contact
can be wired to the VFD terminal strip. Additional spare sen-
sors and Carrier Comfort Network
as well.
CONNECT CONTROL OUTPUTS — Connect auxiliary
equipment, chilled and condenser water pumps, and spare
alarms as required and indicated on job wiring drawings.
UNIT-MOUNTED
VFD
CIRCUIT
BREAKER
HANDLE

EXTENSION

52
CAUTION
CAUTION
modules may be specified
®
a19-2074