Table Of Contents; Introduction; General; Job Data - Carrier AquaEdge 19XRV Installation Instructions Manual

Single-stage semi-hermetic centrifugal liquid chillers with pic iii controls and hfc-134a 50/60 hz
Table of Contents

Advertisement

WARNING
Operation of this equipment with refrigerants other than
those cited herein should comply with ANSI/ASHRAE 15
(latest edition). Contact Carrier for further information on
use of this machine with other refrigerants.
DO NOT ATTEMPT TO REMOVE fittings, covers, etc.,
while machine is under pressure or while machine is run-
ning. Be sure pressure is at 0 psig (0 kPa) before breaking
any refrigerant connection.
CAREFULLY INSPECT all relief valves, rupture discs,
and other relief devices AT LEAST ONCE A YEAR. If
machine operates in a corrosive atmosphere, inspect the
devices at more frequent intervals.
DO NOT ATTEMPT TO REPAIR OR RECONDITION
any relief valve when corrosion or build-up of foreign
material (rust, dirt, scale, etc.) is found within the valve
body or mechanism. Replace the valve.
DO NOT install relief devices in series or backwards.
USE CARE when working near or in line with a com-
pressed spring. Sudden release of the spring can cause it
and objects in its path to act as projectiles.
CAUTION
Failure to follow these procedures may result in personal
injury or damage to equipment.
DO NOT STEP on refrigerant lines. Broken lines can whip
about and release refrigerant, causing personal injury.
DO NOT climb over a machine. Use platform, catwalk, or
staging. Follow safe practices when using ladders.
USE MECHANICAL EQUIPMENT (crane, hoist, etc.) to
lift or move inspection covers or other heavy components.
Even if components are light, use mechanical equipment
when there is a risk of slipping or losing your balance.
BE AWARE that certain automatic start arrangements
CAN ENGAGE THE VFD, TOWER FAN, OR PUMPS.
Open the disconnect ahead of the VFD, tower fan, and
pumps. Shut off the machine or pump before servicing
equipment.
USE only repaired or replacement parts that meet the code
requirements of the original equipment.
DO NOT VENT OR DRAIN waterboxes containing
industrial brines, liquid, gases, or semisolids without the
permission of your process control group.
DO NOT LOOSEN waterbox cover bolts until the water-
box has been completely drained.
DOUBLE-CHECK that coupling nut wrenches, dial indi-
cators, or other items have been removed before rotating
any shafts.
DO NOT LOOSEN a packing gland nut before checking
that the nut has a positive thread engagement.
PERIODICALLY INSPECT all valves, fittings, and piping
for corrosion, rust, leaks, or damage.
PROVIDE A DRAIN connection in the vent line near each
pressure relief device to prevent a build-up of condensate
or rain water.
DO NOT re-use compressor oil or any oil that has been
exposed to the atmosphere. Dispose of oil per local codes
and regulations.
DO NOT leave refrigerant system open to air any longer
than the actual time required to service the equipment. Seal
circuits being serviced and charge with dry nitrogen to pre-
vent oil contamination when timely repairs cannot be
completed.
SAFETY CONSIDERATIONS . . . . . . . . . . . . . . . . . . . . 1,2
INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Job Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
INSTALLATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-70
Receive the Machine . . . . . . . . . . . . . . . . . . 3
Rig the Machine . . . . . . . . . . . . . . . . . . . . . . . 4
Install VFD . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
Step 3 -
Install Machine Supports . . . . . . . . . . . . . 40
Step 4 -
Connect Piping . . . . . . . . . . . . . . . . . . . . . . . 43
EXCHANGERS
Make Electrical Connections . . . . . . . . . 52
Optional UPC Open Controller Wiring . . . . . . . . . . . 64
Lead/Lag Control Wiring . . . . . . . . . . . . . . . . . . . . . . . . 66
Install Field Insulation . . . . . . . . . . . . . . . . 71
INSTALLATION START-UP REQUEST
CHECKLIST . . . . . . . . . . . . . . . . . . . . . . . . . . . CL-1, CL-2

INTRODUCTION

The 19XRV machine is factory assembled,

General -

wired, and leak tested. Installation (not by Carrier) consists
primarily of establishing water and electrical services to the
machine. The rigging, installation, field wiring, field piping,
and insulation of waterbox covers are the responsibility of the
contractor and/or customer. Carrier has no installation respon-
sibilities for the equipment.

Job Data

Necessary information consists of:
• job contract or specifications
• machine location prints
• rigging information
• piping prints and details
• field wiring drawings
• VFD manufacturers installation details
• Carrier certified print
2