Siemens c62 Service Manual page 46

Gsm phase 2+, triple-band - egsm 900 / gsm 1800 / gsm 1900, gprs
Hide thumbs Also See for c62:
Table of Contents

Advertisement

S I E M E N S
C62 Level 2 Service Manual
Final Inspection:
The final inspection contains:
1) A 100% network test (location update, and set up call).
2) A random sample check of:
- data reset (if required)
- optical appearance
- complete function
3) Check if PIN-Code is activated (delete the PIN-Code if necessary).
Basis is the international standard of DIN ISO 2859.
Use Normal Sample Plan Level II and the Quality Border 0,4 for LSO.
Remark: All sample checks must be documented.
Copyright © Siemens Pte Ltd.
All Rights Reserved
ICM MP CCQ SLI RHQ
P T E L T D
45 of 47
C62 Level 2 manual V1.1
Internal Use Only

Advertisement

Table of Contents
loading

Table of Contents