S I E M E N S
C62 Level 2 Service Manual
Step 13 (Domesheet)
Detach the new domesheet from the
protection foil with the tweezers.
Step 15
Ensure that the domesheet is properly
aligned with the pins in the jig.
Step 16
The domesheet is now glued to the PWB.
Copyright © Siemens Pte Ltd.
All Rights Reserved
ICM MP CCQ SLI RHQ
P T E L T D
18 of 47
Step 14
Place the domesheet on the domesheet
assembly jig with the glue surface upwards.
Step 16
Place the PWB onto the jig through the two
(2) pins, which align the PWB on the correct
position.
Step 17 (Antenna Connector)
Push the pins downwards until locked in the
holes.
C62 Level 2 manual V1.1
Internal Use Only