Demolition Hammer Safety Warnings; Specifications; Standard Accessories; Prior To Operation - Hitachi H 60MR Instruction

Table of Contents

Advertisement

Available languages
  • EN

Available languages

English

DEMOLITION HAMMER SAFETY WARNINGS

1. Wear ear protectors.
Exposure to noise can cause hearing loss.
2. Use auxiliary handles supplied with the tool.
Loss of control can cause personal injury.
3. Do not touch the bit during or immediately after
operation. The bit becomes very hot during operation
and could cause serious burns.

SPECIFICATIONS

Model
Voltage (by areas)*
Power Input
Full-load Impact Rate
Weight (without cord, side handle)
*Be sure to check the nameplate on product as it is subject to change by areas.

STANDARD ACCESSORIES

(1) Case ........................................................................... 1
(2) Bull Point (SDS-max shank) .................................... 1
(3) Side Handle ............................................................... 1
Standard accessories are subject to change without
notice.
OPTIONAL ACCESSORIES (sold separately)
Demolishing
(1) Bull Point
Overall Length: 280, 400 mm
Asphalt Cutting
(1) Cutter
Surface Roughing
(1) Bushing Tool
Tamping
(1) Rammer
21
(2) Shank
(2) Shank
4. Before starting to break, chip or drill into a wall,
floor or ceiling, thoroughly confirm that such items
as electric cables or conduits are not buried inside.
5. Wear a mask when turning your head upward.
6. Properly set the bit holder.
7. At the start of work, confirm screw tightening.
8. When working at a highly elevated location, pay
attention to articles and persons below.
9. Wear protective shoes to protect your feet.
H60MR
(110 V, 230 V, 240 V)
1350 W*
1650 min
-1
10.5 kg
Groove digging and edging
(1) Cold chisel
Overall length: 280, 400 mm
Scooping Work
(1) Scoop
Hammer Grease A
500 g (in a can)
70 g (in a tube)
30 g (in a tube)
Optional accessories are subject to change without
notice.
APPLICATIONS
Demolishing concrete, chipping off concrete, grooving,
bar cutting, and driving piles.
Application examples:
Installation of piping and wiring, sanitary facility
installation, machinery installation, water supply and
drainage work, interior jobs, harbor facilities and other
civil engineering work.

PRIOR TO OPERATION

1. Power source
Ensure that the power source to be utilized conforms
to the power requirements specified on the product
nameplate.
H60MRV
930 – 1650 min
-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

H 60mrv

Table of Contents