Graco PR70 Series Operation And Maintenance Manual page 39

2 component liquid dispensing system
Hide thumbs Also See for PR70 Series:
Table of Contents

Advertisement

Pump Assembly
Key:
Ref
P/N
Description
1
106258
ORING, VIT, JCB
2
108712
NUT, HEX, M8 X 1.25, MS
3
120887
POSIPAK, 0.375ID X 0.625OD, COIL
4
120890
RING, RET, INT, 1.00, SS
6
120982
SCREW, SHC, M8 X 1.25 X 65, MS, E
7
15K786
HOUSING, PUMP, PR70S, MACHINED
8
15K787
CAP, END, PUMP, PR70S, MACHINED
To install a new Check Valve Rebuild Kit:
1. With the machine in an idle state and a bucket
below the dispense valve to catch material, fully
extend the piston by pressing
screen.
2. To prevent machine movement, press
3. With a bucket below the check valve to be
replaced, disconnect the male hose fitting from
the check valve housing (13), by loosing the hose
from the housing. Catch any material draining
from the hose into the bucket.
4. Remove the check valve housing (13) from the
pump endcap (8) by loosening the housing with a
wrench.
5. Remove the existing check valve (14) from the
housing (13) by inserting a screwdriver or dowel
rod into the female threaded end of the check
valve housing.
6. With the new check valve ball guide (item #3 in
figure 43) on a bench with the open end up,
install the check valve spring (item 2 of figure 47)
into the guide.
7. Install the check valve ball (item 1 of figure 47) on
top of the spring.
Figure 47: PR70 Check Valve Rebuild Kit (LC0093)
Key:
Ref
P/N
Description
1
105445
BALL,CHECK VALVE
2
121084
SPRING, 0.30OD X 0.44LG, 22#/IN, 20PSI, S
312393C
QTY
2
2
2
2
8
1
2
8. With the rounded inside surface of the check valve
seat (item 4 of figure 47) facing down, place the seat
on top of the check valve ball.
9. Holding both ends of the assembled check valve
in the M1
assembly, install the check valve into the un-threaded
end of the check housing (13) with the ball end facing
out. Apply some pressure to the valve to snugly fit the
(red).
completed check valve into the housing and the fit the
check valve seat (item 4 of figure 47) into the valve
guide.
10. Verify when the assembled check valve and housing
(13) are turned up-side down, that the contents of the
valve stays in place.
11. Re-insert the new valve and valve housing into the
pump end cap, using a wrench.
12. Re-install the material male hose fitting into the check
valve housing using a wrench.
13. Before re-using the machine for operation, activate a
few shots to purge any air present in the material hose
lines due to the procedure.
14. Re-calibrate the machine if necessary.
QTY
Ref
1
1
Ref
P/N
Description
9
15K803
COLLAR, PUMP
10
15K804
HOUSING, BEARING, SEAL, PR70S
11
15K824
SHAFT, PISTON, 3/8, PR70S, SS
12
15K828
WASHER, SEAL, 3/8, PR70S, SS
13
15K895
HOUSING, CHECK VALVE
14
LC0093
KIT, REBUILD, VALVE, CHECK, PR70S
P/N
Description
3
15D312
BUSHING, BALL GUIDE
4
196832
SEAT, LAPPED, CHECK VALVE
QTY
2
2
2
2
2
2
QTY
1
1
39 of 52

Advertisement

Table of Contents
loading

Table of Contents