Packing Procedure - Onkyo HT-RC180(B) Service Manual

Hide thumbs Also See for HT-RC180(B):
Table of Contents

Advertisement

PACKING PROCEDURE

A861
A801
A876
A877
A862
A884
A821
A822
A811
F R
O N
T
U P
Front side
marking
Upper side
marking
Front side
A667
A882
A890
A851
A883
A870
A810
A812
A871
A875
A813
A820
A814
A655
A820
A661
(OUTER)
Front side
A663
Procedure of door section
1. Open the Door.
2. Cushion (A616) on Front panel and fixed with
3. Close the door.
4. Door and Instsheet (A617) are fixed with the
P901
Upper side
marking
Rear side
marking
Front side
A651
(F&R)
A704A
A701
HT-RC180
the Fixlon tape (A615).
A616
A616
A615
L=50mm
Fixlon tape (A615).
A617
A615
L=50mm
A657
(INNER)
A665
A704A
A615
L=50mm
A615
L=70mm
A663

Advertisement

Table of Contents
loading

Table of Contents