Commissioning

8.2 Instructions for commissioning

Notice
Before commissioning, check the basic parameters.
Due to changes in the operating functions, displays and the measurement output could be
set such that the true process pressure is not reproduced.
8.2
Instructions for commissioning
Note
To obtain stable measured values, the transmitter needs to be allowed to warm up for five
minutes or so after the power supply is switched on.
Note
The operating data have to correspond to the values on the nameplate. When you switch the
auxiliary power on, the transmitter is in operation.
8.3

Introduction to commissioning

Following commissioning, the transmitter is immediately ready for use.
To obtain stable measured values, the transmitter needs to be allowed to warm up for five
minutes or so after the power supply is switched on.
The measuring span which can be set corresponds to the information on the nameplate.
Even in the case of a customer-specific setting configured in the factory, the zero point and
the limit point will appear on the nameplate.
If need be, you can change the parameters by simple user operations on the device even
during commissioning.
8-2
SITRANS P300 with HART communication
Operating Instructions, 06/2005, A5E00359579-02