Trigger Operation - DeWalt DW45RN Instruction Manual

Roofing coil nailer
Table of Contents

Advertisement

Available languages

Available languages

• Rotate the platform (I) out.
• Slide platform to the desired position.
• Push platform in to engage platform lever.
FIG. 3
J
PLATFORM POSITION
lowest position
1-1/4" (32 mm) - 1-3/4" (44.5 mm)
upper position
6. Place the coil on the nail platform (I). Insert fasteners with
points down. IMPORTANT: Fasteners must point in the same
direction as they will be driven.
7. Uncoil enough nails [approximately 3" (76  mm)] to reach the
nose of the tool.
8. Insert the first nail into the nose and the second nail (M) between
the two rails of the feed pawl as shown in Fig. 5.
NOTE: Be careful not to deform the coil of nails during the loading
process. Otherwise, the nail guide door will not close and the nails
might not feed consistently.
FIG. 4
I
NAIL LENGTH
3/4" (19 mm) -1-1/4" (32 mm)
- 1-3/4" (44.5 mm)
FIG. 5
9. Close the canister cover (C) completely.
10. Close the nail guide door (G) making sure the door latch (D)
is completely engaged as shown in Fig. 6.
FIG. 6
G

Trigger Operation

WARNING: Always wear proper eye [ANSI Z87.1 (CAN/CSA
Z94.3)] and hearing protection [ANSI S12.6 (S3.19)] when operating
this tool.
8
M
D

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents