Installation Instruction - Haier FCB-051BCN2A Servise Manual

Table of Contents

Advertisement

6. Installation instructions
6.1 Acceptance Inspection
Each fan coil unit is packaged in corrugated cartons to avoid damages during transportation,
handling and site placement.
To make sure no damages occurred due to transportation, please follow below steps to check upon
receiving the equipment:
1.Before acceptance, please check if each unit shows any abnormal facts, if carton edges and
corners are in good conditions and if there're obvious carton damages;
2.For any obvious carton damages, please immediately unpack to inspect the unit. If the unit is
indeed damaged, please indicate on the receipt and refuse to accept. Please also check the
accessories;
3.Check hidden damages of the unit;
4.If any hidden damage is found, do not move the unit on the site. The receiver has the
obligation to prove such damage does not occured after delivery. Meanwhile, please stop
unloading and take photos for reference;
5.If damages are found, please notify the carrier, and request the carrier and the receiver to
conduct a joint inspection;
6.Do not repair it yourself before inspection and confirmation by the carrier representative has been
made;
After confirmation of damages, please contact relative persons for replacement.
6.2 Installation Precautions
To ensure good installation and operation, do check the following items before installation of the
unit:
Adequate space shall be provided for installation and maintenance of the unit. Please
refer to Unit Overall Dimensions and Weight. Removable ceiling panels or accesses shall be
provided for daily maintenance;
Determine locations of pipelines and electric wires before installation;
Make sure hanging structure adequate for support the unit weight;
All units shall be leveled to ensure smooth water drain and proper operation;
The unit connecting air duct shall be within the external static pressure scope;
Thermal insulation of chilled water valves and pipelines shall be made by the installer.
Note:
Untreated water may cause unit dirty, corrosion and deterioration. System testing and
maintenance shall be guided by water treatment experts. Haier shall not be held liable for any
losses due to poor water quality.
Due to limitation of support weight and dimensions, this job shall be collaborated by two
installers to ensure safety.
During off period in winter, water inside the unit shall be drained away to avoid pipe cracks
because of the ice
Commercial Air Conditioner
7
Model:Cassette type Fan Coil

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fcb-085bcn2aFcb-136bcn2aFcb-170bcn2a

Table of Contents