Download Print this page

GE Masoneilan SVi 1000 Instruction Manual page 8

Advanced performance digital positioner

Advertisement

9. Ensure the Serial Interface pulldown and the Address scan fields are correct. Click Apply
and then OK.
NOTE
10. Right-click on the HART Modem and do one of the following:
Selecting Network > Rebuild Network.
or
Selecting Find New Devices.
or
Clicking Add New Device, Figure 6 appears, highlighting SVi1000 HART 5 or 7 and
clicking OK.
11. Right-click on the SVi1000 in the Project pane and click Connect.
12. Click OK to the DTM evaluation period warning, if it appears. The SVi1000 DTM opens.
8 |
=GE Oil & Gas
If device is connected (or powered through DCS), set Master to
Secondary Master.
Figure 6 Add New Device
© 2016 General Electric Company. All rights reserved.

Advertisement

loading