Continental Girbau CG20 Installation Manual page 38

Table of Contents

Advertisement

2. Water Connections:
The water connection is made to the 1/2" M.P.T.
bushing of the electric water solenoid valve located
at the rear upper midsection of the dryer (see
photo). The water solenoid valve has a 3/8" M.P.T.
connection and a 1/2" bushing is supplied to provide
the minimum 1/2-inch supply (feed) line. Flexible
supply line/coupling must be used in an effort to
avoid damaging the electric water solenoid valve.
IMPORTANT: Flexible supply line/coupling must be used. Solenoid valve failure due to hard
plumbing connections WILL VOID WARRANTY. It is recommended that a filter
or strainer be installed in the water supply line.
Typical water supply...
34