Getting Started
1
Install Components. For the dimensions of components see
Dimensions, page 5.
2
Wire the MP2+ System and TM02 together as shown in fig. A, page 6.
3
Apply 24 VAC power to AM02+ and TM02.
MP2+ System will default to the "READY" program start position
of Program #1.
NOTE:
Any future power interruption to the AM02+, will cause the MP2+
System to default to the selected program start position of the program in use
prior to the power interruption ("READY" or First Process).
4
Enter into the Program Mode and program the MP2+ System as need-
ed (see the MP2+ User's / Programming Guide).
After programming, the MP2+ System will default to the selected
program start position "READY" or First Process of the program in
use prior to programming.
"READY":
Start Process 1 of the program by pushing and releasing Button 1
or momentarily latching (make) a set of contacts wired to the TB1
terminal (i.e. typically accomplished by a momentary ON (normally
open) switch).