Installation; Mp2+ Process Control System - Maxitrol MP2+ Installation Manual

Multiple prigram process temperature controller
Hide thumbs Also See for MP2+:
Table of Contents

Advertisement

MP2+ Process Control System

Getting Started
1
Install Components. For the dimensions of components see
Dimensions, page 5.
2
Wire the MP2+ System as shown in figure A, page 6.
3
Apply 24 VAC power to AM02+.
MP2+ System will default to Process 1 of Program #1.
NOTE: Any power interruption to the AM02+, will cause the MP2+ System
to default to the Process 1 position of the program in use regardless of the
Process position prior to the power interruption.
4
Enter into the Program Mode and program the MP2+ System as needed
(see the MP2+ User's / Programming Guide).
After programming, the MP2+ System will default to Process 1 of
the current program.
5
Set the Programming Lockout feature to the appropriate user access
(see figure B, page 7).
© 2006 Maxitrol Company, All Rights Reserved
8

Installation

Advertisement

Table of Contents
loading

Related Products for Maxitrol MP2+

Table of Contents