Introduction; Installation Checklist - Patton electronics SmartNode 2294 Getting Started Manual

Leased-line extenders over ip
Hide thumbs Also See for SmartNode 2294:
Table of Contents

Advertisement

Model 2292 & 2294 Series Getting Started Guide

Introduction

This appendix lists the tasks for installing a SmartNode 2292 or 2294 Series extender (see
copy of this checklist and mark the entries as you complete each task. For each SmartNode 2292 or 2294 Series
extender, include a copy of the completed checklist in your site log.
Network information available & recorded in site log
Environmental specifications verified
Installation site pre-power check completed
Additional equipment available
All printed documents available
SmartWare release & build number verified
Rack, desktop, or wall mounting of chassis completed
Initial electrical connections established
ASCII terminal attached to console port
Initial configuration performed
Introduction
Table 11. Installation checklist
Task
Site power voltages verified
Required tools available
Cable length limits verified
Initial operation verified
E • Installation checklist
table
Verified by
Date
11) . Make a
53

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smartnode 2292

Table of Contents