Sharp vc-ga56z Service Manual page 26

Video cassette recorder
Table of Contents

Advertisement

VC-GA56Z
VC-GH96Z
4-23. INSTALLING THE SHIFTER
Capstan
D.D. motor
Reel pulley
(Bottom side of mechanism chassis)
Figure 4-42.
1. Make sure that the loading gear is at the Phase-
2. Install, paying attention to insert point 5 and release
Drum
3. For the phase matching at the insert point 1, see the
4. Finally fix the inserts 1 and 4.
Insert
point 3
Insert
point 2
Shaft 1
Rotation
point 2
Shaft 1
Phase-matching
point 1
Figure 4-43.
26
Matching point 1 as shown below.
point 3.
Phase-Matching point 2 as shown below.
Phase-Matching
point 2
Loading gear (T)
Round mark
Insert
point 1
Sifter
Shaft 1
Half round notch
Insert
point 4
Shaft 4
Release
point 3
Insert
point 5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vc-gh96z

Table of Contents