Service Clearances And Access Locations; Inspection - Greenheck ERCH-20 Installation, Operation And Maintenance Manual

Energy recovery ventilator with heating and cooling
Table of Contents

Advertisement

Service Clearances / Access Panel - Heating Only
Units require minimum clearances for access on all sides for routine maintenance. Filter replacement, drain pan
inspection and cleaning, energy wheel cassette inspection, fan bearing lubrication and belt adjustment are examples
of routine maintenance that must be performed. Blower and motor assemblies, energy recovery wheel cassette, coil
and filter sections are always provided with a service door or panel for proper component access.
*Cassette removal only available
on housing sizes 20 and 45.
B
ACCESS DOOR
OUTDOOR
WEATHERHOOD
Drawing shows both heating coil and indirect gas furnace options. Electric heat is also available. Only one can
be selected.
8
Energy Recovery Ventilator with Heating and Cooling
General Description - NOT model specific
EXHAUST AIR
WEATHERHOOD
36 inches
PIPING VESTIBULE
(OPTIONAL)
Model
ERCH-20
ERCH-45
ERCH-55
ERCH-90
A
ELECTRICAL BOX
A (in.)
B (in.)
48
36
64
42
42
42
42
48
52 inches
CLEARANCE WITH
IG HEATER
0 inches
CLEARANCE WITHOUT
IG HEATER
®

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Erch-55Erch-90Erch-45

Table of Contents