Obtaining The Installation Procedures; Reviewing The Configuration For The Servers - Mitel 6500 Starting Manual

Unified communications
Table of Contents

Advertisement

Start Here Guide

Obtaining the Installation Procedures

1. The paper Installation and Maintenance Guide is supplied with the 6500 Unified
Communications software package. You can also obtain this paper Installation and
Maintenance Guide (PN 50003280) from Customer Service, or access the .pdf file from
Mitel OnLine, or from the 6500 Unified Communications Applications Software Disc 1.
2. Refer to Chapter 1 for the new installation or to Chapter 2 for the upgrade installation.
Follow the procedures in the order that they are presented.
Note: For the 6500 Unified Messaging system, the Configuration Wizard integrates
6500 Unified Communications with your network environment.

Reviewing the Configuration for the Servers

Checklist for the new 6500 Attendant System
6500 Server
q
Stopped all services, except Lightweight Directory Access Protocol (LDAP) and Nuance
License Manager (NLM), in Service Recovery Manager in order to change the Transmis-
sion Control Protocol (TCP)/Internet Protocol (IP) properties and the computer name. Set
Start mode to Manual.
q
Changed the TCP/IP properties and the computer name.
q
Entered the new computer name in Microsoft® Windows NT and used Internet Service
Manager in Microsoft Internet Information Server (IIS) to reconnect to the new computer
name.
q
For an IP integration, configured IP Phone Emulator, Mitel Remote Access, Telephony,
Multimedia, and Sounds in Control Panel.
q
Entered the new computer name for the Oracle settings in the Admin Web Page.
q
Restarted the server.
q
Verified that the server can ping the other servers on the network and can be pinged back.
-
Joined the domain (optional).
6
56004892, Revision A

Advertisement

Table of Contents
loading

Table of Contents