Adjustments Flow Chart When Replacing The T100 - Samsung GX-20 Service Manual

Hide thumbs Also See for GX-20:
Table of Contents

Advertisement

3. Adjustments flow chart when replacing the T100

The sequence of adjustments items when replacing the T100 main circuit board is as follows.
●Note Prod. ID FW 「Product ID FW」
●Set the initial data 「Initial Data Set」
SR adjustment (SR unit adjustment)
「K20D_SR_Operation_Adjustment」
Single-lens reflex functional section adjustment
「K20D_PDCAdj」
「K20D_Uniformity_CS」
SR adjustment (SR gain adjustment)
Shutter speed adjustment according to the histogram
Function test
*SR check can be skipped if SR adjustment is completed.
(※Data initialization is unavailable)
「K20D_FI_CS」
「77010 SR_Gain For CS」
Digital section adjustment
「77010 M-Test CS」
「K20D_PDCAdj」
- This Document can not be used without Samsung's authorization -
Ⅵ. ADJUSTMENT
WDC (Adjust the defective white pixels)
「77010_White Pixel Adjust」
Initial settings
(Initialized at the factory)
「Initialize Set」
77

Advertisement

Table of Contents
loading

Table of Contents