HORIZONTAL OR VERTICAL UNIT — DUAL COIL
REMOVAL (39LA,39LD units — size 25) — (NOTE: Item
numbers are in Fig. 49 unless otherwise indicated.)
1. Refer to Fig. 10 for service area requirements.
2. Disconnect piping (Item 5).
3. Horizontal Unit, 39LA — On top panel (Item 3) remove
screws located directly above side panels (Items 2 and 6).
Top panels may be removed from unit to provide more
workspace, but it is not required.
Vertical Unit, 39LD — Through fan access door (Item 2,
Fig. 41), remove screws (Item 3, Fig. 48) holding angle
(Item 4, Fig. 48) to top of coil panels (Item 7, Fig. 48).
Remove rear panel (Item 17, Fig. 48) and remove baffle
angle screws (Item 4) holding top baffle to coil.
Fig. 49 — Horizontal or Vertical Unit — Dual Coil Removal (39LA,LD Units, Sizes 25)
1 — Accessory Side Panel
2 — Left Side Panel
3 — Top Panels
4 — Baffle Angle Screws
5 — Piping
40
4. Remove side panel(s) (Item 6).
NOTE: Vertical units may require support of fan section
after removal of side panels.
5. If accessory is present, remove accessory side panel (Item
1) on left side of unit. Detach filter track support bracket
if upstream accessory is a filter.
6. Remove screws from horizontal baffle (Item 8). Leave
baffle attached to upper condensate pan (Item 9).
7. Remove screws from inside baffles (Item 7). Leave
baffles attached to left side panel (Item 2).
8. Slide coils and header and baffles from unit.
9.
Replace coils by reversing proceeding Steps 1-8.
LEGEND
6 — Right Side Panels
7 — Inside Baffle
8 — Horizontal Baffle
9 — Upper Condensate Pan
10 — Baffle Screw