Unpacking; Installing; Leveling - ULTRAFRYER PD14 Operation Instructions Manual

Dual rated gas fryer model pd14” (356mm)
Table of Contents

Advertisement

A. UNPACKING: Check that the container is upright. Use an outward prying motion – DO NOT USE A HAMMER - to remove the
carton. Check the fryer for visible damage; if such damage has occurred do not refuse shipment, but contact the carrier and file
the appropriate freight claims.
B. INSTALLING: Roll the assembled fryer into the building and to its operating location.
WARNING: IMPROPER INSTALLATION, ADJUSTMENT, ALTERATION, SERVICE OR MAINTENANCE CAN CAUSE
PROPERTY DAMAGE, INJURY, OR DEATH. READ THE INSTALLATION, OPERATING, AND MAINTENANCE
INSTRUCTIONS THOROUGHLY BEFORE INSTALLING OR SERVICING THIS EQUIPMENT.
C. LEVELING:
1.
When the fryer is placed in its operating location, check to be sure it is level. If not, loosen the casters and insert the appropri-
ate number of shim plates between leg and caster plates; then retighten the caster bolts.
2.
If the floor is smooth and level, adjust to the high corner and measure with a spirit level. If the floor is uneven or has a
decided slope, level the unit with metal shims.
NOTE: A caster may not return exactly to the same position after being moved, which may require re-leveling after each move.
3.
Connect the gas manifold to the building gas supply line by means of a CSA International APPROVED flexible gas line as
shown in the figure below.
NOTE: CONNECT-IT inc. 3⁄4" (19mm), 1" (25mm) and 1 1⁄4" (32mm) flexible gas hose 4 feet long (1219mm) with a quick
disconnect coupling on one end is available from Ultrafryer Systems under PN 24322 (3⁄4" (19mm) hose), PN 24323
(1" (25mm) hose) and PN 24456 (1 1⁄4" (32mm) hose). These hoses are equipped with a fusible link, which melts at
361˚F (183˚C) that will SHUT OFF the gas supply when it melts. A 44" (1119mm) long restraining device is also
available under PN 24324.
CAUTION: THE BUILDING GAS SUPPLY LINE MUST BE SIZED TO PROVIDE THE VOLUME OF GAS REQUIRED FOR
PROPER OPERATION AS EXPLAINED ON THE PREVIOUS PAGE.
WARNING: THE RESTRAINT DEVICE (ITEM 9) MUST BE INSTALLED TO ASSURE TENSION CANNOT BE PLACED
30A215-Mar2008
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
ON THE GAS OR ELECTRICAL CONNECTIONS
1. BUILDING GAS SERVICE LINE
2. MAIN GAS CUT-OFF VALVE
3. CONNECT-IT QUICK-DISCONNECT
4. FLEX-CON CONNECTOR
5. ELBOW
6. APPLIANCE MANIFOLD/NIPPLE
7. EYELET FASTENERS
8. SPRING HOOK
9. RESTRAINING CHAIN
15

Advertisement

Table of Contents
loading

Table of Contents