Download Print this page

Proper Installation - GE pnrv12zbl01 Owner's Manual

The countertop faucet dispenses
Hide thumbs Also See for pnrv12zbl01:

Advertisement

PROPER INSTALLATION

This Reverse Osmosis system must be properly installed
and located in accordance with the Installation Instructions
before it is used. If you did not receive Installation
Instructions, you can receive one by calling us toll-free
at the GE Answer Center
Install or store where it will not
be exposed to temperatures
below freezing or exposed to
any type of weather. Water
freezing in the system will
break it. Do not attempt to
treat water over 100°F.
Do not install on HOT WATER.
The temperature of the water
supply to the Reverse Osmosis
system must be between the
minimum of 40°F. to the
maximum of 100°F. See the
Specification Guidelines.
®
800.626.2000.
Do Not open the water
supply/saddle valve until
the pipes have been flushed.
WARNING:
unused parts and packaging
material after installation.
Small parts remaining after
the installation could be a
choke hazard.
Sanitizing is recommended
upon installation of the
Reverse Osmosis system, and
after servicing inner parts. It
is important for the service
person to have clean hands
while handling inner parts of
the system. See the Sanitizing
the Reverse Osmosis System
section.
Discard all
5

Hide quick links:

Advertisement

loading