Pump Down Operation - Daikin FTXM-K Series Service Manual

Inverter pair
Table of Contents

Advertisement

Pump Down Operation

1. Pump Down Operation

Outline
In order to protect the environment, be sure to conduct pump down operation when relocating or
disposing of the unit.
Detail
1) Remove the valve caps from the liquid stop valve and the gas stop valve.
2) Carry out forced cooling operation.
3) After 5 to 10 minutes, close the liquid stop valve with a hexagonal wrench.
4) After 2 to 3 minutes, close the gas stop valve and stop the forced cooling operation.
Refer to forced cooling operation on Page 110.
109
Liquid stop valve
Gas stop valve
Service port
Hexagonal
wrench
Close
Valve cap
(R13628)
Trial Operation and Field Settings
SiBE041434E

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents