Mitsubishi Electric SRK19CIS Technical Manual page 32

Table of Contents

Advertisement

(3) Air purge
(a)
Tighten all flare nuts in the pipings both indoor and outside will so as not to cause leak.
(b)
Connect service valve, charge hose, manifold valve and vacuum pump as is illustrated below.
(c)
Open manifold valve handle Lo to its full width, and perform vacuum or evacuation.
Continue the vacuum or evacuation operation for 15 minutes or more and check to see that the vacuum gauge reads – 0.1 MPa
(– 76 cmHg).
(d)
After completing vacuum operation, fully open service valve (Both gas and liquid sides) with hexagon headed wrench.
(e)
Detach the charge hoses, from the service port.
(f)
Check f
or possible leakage of gas in the connection parts of both indoor and outdoor.
·
Please use an anti-reverse flow type vacuum pump adapter so as to prevent vacuum pump oil from running back into the system.
Oil running back into an air-conditioning system may cause the refrigerant cycle to break down.
Additional refrigerant charge
When refrigerant piping exceeds 7m conduct additional refrigerant charge by weight after refrigerant piping completion.
Additional charge amount per meter = 10g/m
[Example]
How much amount of additional charge for 25m piping?
(25 – 7)m
10g/m = 180g 180g for additional charge
(4) Insulation of connecting portion
(a)
Cover the connecting portion of the refrigerant piping with the pipe cover and seal them.
If neglecting to do so, moisture occurs on the piping and water will drip out.
Vinyl tape
(b)
Finishing and fixing
1)
Tie up the piping with wrapping tape, and shape it so
that it conforms to which the pipe is attached.
2)
Fix them with clamps as right figure.
Service Valve
(two-way valve)
–0.1MPa
(–76cmHg)
Service Valve
(three-way valve)
Handle Lo
Service Port
Charge hose
(Designed specifically for R22)
To cover the connecting portion with
insulation materials, cut upper portion and
then seal it with insulation materials.
-
Compound
Pressure
pressure
gauge
gauge
Gauge Manifold
(Designed specifically for R22)
Handle Hi.
Charge hose
(Designed specifically for R22)
Vacuum pump
Vacuum pump adapter
(Anti-reverse flow type)
(Designed specifically for R22)
Insulation
Refrigerant piping
Electrical wiring
Covering tape
Drain hose
Tapping screw
31
-
Cover the exterior portion with cov-
ering tape and shape the piping so
it will match the contours of the
route that the piping to take. Also
fix the wiring and pipings to the
wall with clamps.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srk25cis

Table of Contents