NEW CONSTRUCTION ASSEMBLY INSTRUCTIONS
4. Install a circular 4 in. or 3 in. duct (not included)
and secure it with duct tape or clamps (neither
included).
Finish ceiling work. Ceiling hole should be aligned
with edge of fan body (A).
5. Using two short machine screws (BB) mount
decorative pan (C) to body.
Hardware Used
Short machine
BB
screw
6. Install two 40 watt candelabra bulbs (not included),
or two E12 13 watt bulbs (not included).
7. Mount glass globe (B) to decorative pan (C).
Place glass globe (B) against decorative pan (C)
and align indentation in glass globe (B) with
nubs on decorative pan (C). Rotate glass globe
clockwise (B) until it locks into place.
4
5
x 2
6
7
7
C
C
B
Lowes.com