NEC D3 Quick Start Manual page 21

San storage
Table of Contents

Advertisement

4. After the process has completed, ensure that the "Host information was exported successfully"
message has appeared.
5. After the process is finished, a "Command has completed successfully" message will be displayed and
the host information file will be created in the root directory of the drive where the command was
launched. You can then copy the generated file, named after the server name entered in Step 3, from
the application server to the management server via a network share or portable storage media for use
during the logical disk binding process.
NEC D3/D4 Quick Start Guide
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D4D3-10D1-10

Table of Contents