Planning Installation - EcoWater ECR 3500R20 Owner's Manual

Hydrolink & hydrolink plus series 3500 series 3502
Hide thumbs Also See for ECR 3500R20:
Table of Contents

Advertisement

ECOWATER
S Y S T E M S
HARD
WATER
OUTLET
INLET
CABINET
MODEL
brine tank
overflow hose
INLET / OUTLET PLUMBING OPTIONS
ALWAYS INSTALL either an EcoWater Systems bypass
=
valve #7214383, or a 3-valve bypass system. Bypass
valves allow you to turn off water to the conditioner/
refiner for repairs if needed, but still have water in
house pipes.
OTHER REQUIREMENTS
A drain is needed for recharge discharge water. A floor
=
drain is preferred, close to the EcoWater Systems
conditioner/refiner. A laundry tub, standpipe, etc., are
other options (See Figure 1B).
A 120V, 60 Hz, grounded, continuously "live" electrical
=
outlet is needed, in a dry location near the EcoWater
Systems conditioner/refiner.
TYPICAL INSTALLATION DRAWINGS
120V,
60 Hz
power supply
(included)
to
controller
NOTE: Faceplate and support
not shown for clarity of drawing.
valve drain hose
Tie or wire valve drain hose in place
1- -1/2"
floor drain
airgap
CONDITIONED
WATER
outlet
outlet valve
to
controller
bypass valve
#7214383
to keep over floor drain.
drain
hose
STANDPIPE
NOTE: The Commonwealth of Massachusetts plumbing
code 248-CMR shall be adhered to. A licensed plumber
shall be used for this installation.
5

Planning Installation

bypass valve
3- - valve
bypass system
inlet valve
OUTLET
INLET
TWO--TANK
MODEL
1- -1/2"
airgap
DRAIN OPTIONS
1- -1/2"
airgap
1- -1/2"
airgap
LAUNDRY TUB
HARD
WATER
valve drain hose
brine
tank
overflow
hose
floor drain
FIG. 1
drain
hose
FIG. 1B

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents