Duracell DG65M-R62 Series Owner's Manual page 17

Table of Contents

Advertisement

4. The last step is attaching the handle.
Please note there are two different length bolts; the
longer bolt will go through the upper hole and the short
bolt through the lower hole:
Start by installing the upper bolt and nut to hold the handle in place, only tighten by hand at this
point. We will tighten the bolt later: * Use M8 x 35 bolts and M8 nuts.
Now partially remove the handle pivot bolt as shown to allow the
insertion of the lower bolt. This bolt is an M8 x 50.
Next secure the upper and lower bolts by tightening them with the
wrenches or sockets as shown.
Now reassemble the handle pivot bolt and tight enough
that the handle moves freely and will drop down from its'
own weight. Then repeat these steps for the other
handle. When complete the handles should look like the
photo.
Handle Operation:
These handles have a self locking mechanism that must
be set before raising the handle. Simply raise the locking
pin up and away from the frame into this position. Then
raise the handle, the handle should lock with the locking
pin moving forward and dropping into the locking slot. To
lower the handles just pull up on the locking pins and the
handles will drop.
DG65M-R62
15 |
P a g e

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents