Download Print this page

Honeywell 2RM7800L1087 Installation Instructions Manual page 15

Relay modules with valve proving

Advertisement

Edit:
-
Fig. 16. Select/Restart screen.
11. Press down arrow to select.
12. "Getting Data" will be momentarily displayed, followed
by the screen shown in Fig. 12.
Changing the Installed Postpurge
Edit:
-
Fig. 17. Setting Postpurge time.
This screen allows for setting up the Postpurge for the
RM7800L/40G,L, EC7840L. This will be the time that the
Combustion Fan (terminal 5) will remain energized after the
demand ends.
NOTE: The device comes standard with 15-second Post-
purge.
13. Use the +/- buttons to adjust the postpurge time.
Time changes:
0 to 60 seconds in 1-second intervals.
60 to 600 seconds in 10-second intervals.
10 to 60 minutes in 1-minute intervals.
14. Press Enter (Left/Right arrow keys simultaneously)
when the correct postpurge time is displayed.
Edit:
-
Fig. 18. Save Changes screen.
15. Use the down arrow to save changes. "Getting Data" is
displayed momentarily.
The following steps are to confirm your selections.
RM7800L1087; RM7840G1022,L1075; EC7840L1014 RELAY MODULES WITH VALVE PROVING
+
M22764B
+
M22668
+
M22665B
Edit:
-
Fig. 19. Confirmation Acknowledgement screen. (The
Valve Proving Test location is shown.)
16. Press ENTER.
Edit:
-
Fig. 20. Confirmation Correct screen.
17. Use the down arrow to confirm correct.
NOTE: Using the up arrow during this step will take you back
to the beginning of the setup routine.
"Getting Data" will be displayed.
Edit:
-
Fig. 21. Confirm screen.
18. Press Enter.
Edit:
-
Fig. 22. Confirm Correct screen.
19. Use the down arrow to confirm correct.
"Getting Data" will be displayed.
The following steps are used to confirm your selection.
15
+
M22670B
+
M22671B
+
M22672A
+
M22671B
66-1162—2

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Rm7840g1022,l1075Ec7840l1014