Introduction - Bfb 3D Touch Set Up And Operation Manual

Table of Contents

Advertisement

1. Introduction

Thank you for purchasing your 3D Touch.
Before first use, the 3D Touch needs careful setting up. The list below illustrates some of the essential operations which must be carried out before
operation:
Make sure the bed is clear of any build material
Check the bed is fitted correctly
Check the hot-end nozzles are clean from plastic debris
Check the bed is level
Check the bed is referenced to the extruder nozzles
Load the extruders correctly
Print a successful raft
Failure to carry out
This document has been designed to illustrate the
understand how the process works and complete each procedure in the order set out in this manual. Setting up can take from 20-60 minutes
depending on the skill level of the operator.
Support is available by raising a ticket at www.bitsfrombytes.com
We welcome any feedback you may have, and wish you well in your 3D printing!
3D Touch
all
of the set-up procedures contained in this document will damage the machine.
essential
procedures and get you up and running as quickly as possible. Please take time to
Page 6

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 3D Touch and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF