Check Tire Pressure; Check Accumulator Charge - Toro 09801 Operator's Manual

Hide thumbs Also See for 09801:
Table of Contents

Advertisement

CHECK TIRE PRESSURE

Tires are over inflated for shipping. Make sure the front
and rear tires are inflated to 55–82 psi.
CHECK THE ACCUMULATOR
CHARGE
Have the accumulator charge checked before and after
each operating season by an Authorized TORO
Distributor.
Charged accumulators contain high-pressure nitrogen.
Nitrogen is the only gas to use for accumulator char-
ing. Installing Improper gasses in an accumulator can
cause an explosion and death.
Charging requires special tools and precautions.
Charge accumulators in a well-ventilated area. Have
the accumulator checked and charged by an authorized
TORO distributor.
Wear eye protection. Keep your hands and face away
from the gas valve.
Slowly open the high-pressure water bleed valve
before servicing any component connected to the high-
pressure water system. Opening the high-pressure
bleed valve allows any trapped water to escape from
the system and also allows the accumulator platon to
move the bottom of the accumulator cylinder. Failure
to open the bleed valve before servicing high-pressure
water components can cause personal injury, dismem-
berment or death!
Charged accumulators cannot be shipped via air
freight.
16
WARNING

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hydroject 3000

Table of Contents