Maintenance; Recommended Maintenance Schedule - Toro 74268TE Operator's Manual

With 152cm turbo force side discharge mower
Hide thumbs Also See for 74268TE:
Table of Contents

Advertisement

Maintenance

Note: Determine the left and right sides of the machine from the normal operating position.

Recommended Maintenance Schedule

Maintenance Service
Interval
After first 8 hours
After first 50 hours
After first 250 hours
Each Use
Every 8 Hours
Every 25 Hours
Every 50 Hours
Every 100 Hours
Every 150 Hours
Every 200 Hours
Every 250 Hours
Every 300 Hours
Every 500 Hours or at
Storage
Every 600 Hours
Every 800 Hours
Maintenance Procedure
Hydraulic fluid—check level
Hydraulic filter—change
Engine Oil—change
Oil Filter—change
Primary hydraulic filter—change
Cooling Fan hydraulic filter—change
Oil—check level
Safety system—check
Mower housing—clean
1
Engine air intake—clean
Engine coolant—check
Cutting Blades—check
Cooling fan belt idler arm—grease
Mower belt idler arm—grease
Pump drive belt idler arm—grease
Traction belt idler arm—grease
Brake lever—grease
Mower support arms—grease
1
Linkage bushings—oil
Hydraulic fluid—check level
Battery—check electrolyte
Blade Spindle Bearings—grease
Tires—check pressure
Belts—check for wear/cracks
Hydraulic lines—check
Engine Cooling System—clean
Hydraulic lines—check
Cooling system hoses—check
1
Engine Oil—change
Brake pivot—grease
Engine Cooling System—check
1
Primary Air filter—clean
Oil Filter—change
Caster Pivot— adjust
Wheel Hub Slotted Nut— adjust
1
Safety Air filter—replace
Fuel filter—replace
33
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z597–d z master

Table of Contents