Premaintenance Procedures; Removing The Hood; Lubrication; Greasing The Bearings And Bushings - Toro 03780 Operator's Manual

4-wheel drive traction unit
Hide thumbs Also See for 03780:
Table of Contents

Advertisement

Premaintenance
Procedures

Removing the Hood

1. Release hood latches (Figure 40) and pivot open the
hood.
Figure 40
1. Hood latch (2)
2. Remove the cotter pins securing the rear hood brackets
to the frame pins and lift off the hood.

Lubrication

Greasing the Bearings and
Bushings
Service Interval: Every 50 hours
The machine has grease fittings that must be lubricated
regularly with No. 2 General Purpose Lithium Base Grease.
If the machine is operated under normal conditions, lubricate
all bearings and bushings after every 50 hours of operation or
immediately after every washing.
The grease fitting locations and quantities are as follows:
Brake shaft pivot bearings (5) (Figure 41)
Rear axle pivot bushings (2) (Figure 42)
39
Figure 41
Figure 42

Advertisement

Table of Contents
loading

This manual is also suitable for:

03780aReelmaster 7000-d

Table of Contents