Table Of Contents - Mitsubishi PLK-E03BT Technical Manual

Industrial sewing machine
Hide thumbs Also See for PLK-E03BT:
Table of Contents

Advertisement

1. STRUCTURE OF THE MACHINE ······································································
2. SPECIFICATION ··································································································
3. INSTALLATION ···································································································
3-1. Preparation of the table ···················································································
3-2. Preparation for the steel stand ········································································
3-3. Installation of the motor ···················································································
3-4. Installation of the control box ··········································································
3-5. Connection of the operation panel ··································································
3-6. Installation of the power switch ·······································································
3-7. Connection of the foot switch ·········································································
3-8. Installation of the oil pan ·················································································
3-9. Installation of the sewing machine head ··························································
3-10. Putting across the V-belt ···············································································
3-11. Connection of the electric cables ···································································
3-12. Installation of the belt cover ··········································································
3-13. Installation of the thread stand ·······································································
4. LUBRICATION ······································································································ 10
4-1. Filling the oil tank ····························································································· 10
4-1. Oiling ··············································································································
5. PROPER OPERATION ······················································································
5-1. Loading the system software to the control box ·············································
5-2. Installation of the needle ················································································· 11
5-3 Threading the upper thread ·············································································
5-4. Winding the bobbin thread ·············································································
5-5. Setting the bobbin ··························································································· 14
5-6. Setting the bobbin case ··················································································
6. PROPER SEWING ······························································································· 15
6-1. Operation of the halt switch ············································································· 15
6-2. The sewing operation ·····················································································
6-3. Adjustment of the thread tension ···································································· 20
CONTENTS
1
2
3
3
3
3
3
3
4
4
5
5
6
7
8
9
10
11
11
12
12
14
16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents