3-12 Installation of the belt cover

(1) Put the small belt cover (NO.1) on the sewing machine head with the setscrew (NO.2)
temporally.
(2) Put large belt cover (NO.3) with the setscrews (NO.4, 5, 6, 7).
(3) Fasten these the setscrew (NO.2) securely.
All the necessary parts are enclosed in the accessory box.
2
Fig
Con
Connect with
1
A
Main motor cable
2
B
Power supply cable
5
3
C
Stepping motor cable
4
D
Solenoid output cable
6
5
E
RS-232C (optional use)
6
F
Operation panel cable
7
7
G
Extension I/O cable
8
8
H
Input signal cable
9
I
Foot switch cable
9
1
7
-8-
5
3
6
8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents