Wiring Procedure - Toshiba RAS-4M27S3AV-E Service Manual

Table of Contents

Advertisement

Air conditioner demand response
Demand response mode
DRM1
DRM2
DRM3
*1: E30m = total electrical energy (kWh) used by the air conditioner for all purposes (including compressors, controls and fans) over a 30 min period.
*
*2:
= rated input electrical power of the air conditioner (kW) at rated capacity in the mode in which it is operating during the demand response event
(i.e.cooling or heating).

Wiring procedure

1. Securely fasten the demand connecting wires with the cord clamp located at the upper portion of the terminal block so that no external force is applied to the
terminal.
* The demand connecting wires having a relay connector (RJ45) should be wired in such a manner as to prevent water intrusion into the relay connector.
2. Bundle the demand connecting wires with indoor/outdoor connecting wires using a fi xing band (locally procured).
Description
Compressor off
E30m ≤ R × 0.50 × 0.5
E30m ≤ R × 0.75 × 0.5
Cord clamp
DRED terminal block connections
Banding band
- 39 -