*1: E30m = total electrical energy (kWh) used by the air conditioner for all purposes (including compressors, controls and fans) over a 30 min period.
*
*2:
= rated input electrical power of the air conditioner (kW) at rated capacity in the mode in which it is operating during the demand response event
(i.e.cooling or heating).
Wiring procedure
■
1. Securely fasten the demand connecting wires with the cord clamp located at the upper portion of the terminal block so that no external force is applied to the
terminal.
* The demand connecting wires having a relay connector (RJ45) should be wired in such a manner as to prevent water intrusion into the relay connector.
2. Bundle the demand connecting wires with indoor/outdoor connecting wires using a fi xing band (locally procured).