Set-Up - Cub Cadet 524 SWE Operator's Manual

Two stage snow thrower
Hide thumbs Also See for 524 SWE:
Table of Contents

Advertisement

6.
Insert the hex rod into the pinion gear below the joystick.
Make sure to line up the hole in the hex rod with the arrow
on the pinion gear. See Fig. 3-8.
NOTE: The hex rod will fit snuggly into the pinion gear.
Support the rear of the dash panel with one hand while
inserting the hex rod with your other hand to ensure the
hex rod is inserted all the way into the pinion gear.
NOTE: The hole is a reference for aligning the rod with the
indicator arrow on the pinion gear, and will be visible after
the rod has been inserted.
Figure 3-8
7.
Push the hex rod toward the control panel until the hole
in the hex rod lines up with the hole in the chute control
input closest to the chute control head and insert the
cotter pin. See Fig. 3-9.
NOTE: The second hole is used to achieve further
engagement of the hex rod into the pinion gear if required.
Refer to page 18 for Chute Control Rod adjustments.
Figure 3-9
8.
Finish securing chute control head to chute support
bracket with wing nut, clevis pin, and bow-tie cotter pin
removed in step 1. See Fig. 3-3.
9.
Check that all cables are properly routed through the cable
guide on top of the engine. See Fig. 3-10.
NOTE: For smoothest operation, the cables should all be to
the left of the hex rod.
NOTE: Models with 2-Way Chute Control have only one
cable to route through the cable guide.
Figure 3-10

Set-Up

Shear Pins
A pair of replacement auger shear pins and bow tie cotter pins
are included with your snow thrower. Store them in your snow
thrower's dash panel until needed. See Fig. 3-11.
Figure 3-11
s
ectiOn
3 — a
& s
-u
sseMbly
et
p
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

526 swe528 sw528 swe

Table of Contents