Assembly & Set-Up - Cub Cadet 524 SWE Operator's Manual

Hide thumbs Also See for 524 SWE:
Table of Contents

Advertisement

Assembly & Set-Up
Contents of Carton
One Snow Thrower
Assembly
Handle
1.
Place the shift lever in the Forward-6 position
2.
Observe the lower rear area of the snow thrower to be sure
both cables are aligned with roller guides before pivoting
the handle upward. See Fig. 3-1.
Figure 3-1
NOTE: Make certain the upper ends of each cable are
seated properly in its bracket.
3.
Secure the handle by tightening the plastic knob located
on both the left and right sides of the handle. Remove
and discard any rubber bands, if present. They are for
packaging purposes only.
Chute Assembly
1.
Remove wing nut and hex screw from chute control assembly
and clevis pin and cotter pin from chute support bracket.
Position the chute assembly (forward-facing) over the
chute base. See Fig. 3-2.
2.
Place chute assembly onto chute base and secure chute
control assembly to chute support bracket with clevis pin
and cotter pin removed earlier. See See Fig. 3-3.
Two Replacement Auger Shear Pins
One Snow Thrower Operator's
Manual
Figure 3-2
Figure 3-3
3
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents