Installation; Starting; Installation Installation - LG GA-419 Owner's Manual

Table of Contents

Advertisement

Installation

Installation

Starting

Downloaded from Fridge-Manual.com Manuals
1.
Select a good location.
Place your fridge-freezer where it is easy to use.
2.
Avoid placing the unit near heat sources, direct
sunlight or moisture.
3.
To ensure proper air circulation around the
fridge -freezer, please maintain sufficient space on
both the sides as well as top and maintain at least
2 inches (5 cm) from the rear wall.
4.
To avoid vibration, the unit must be leveled. If
required, adjust the leveling screws to compensate for
the uneven floor.
The front should be slightly higher than the rear to
aid in door closing.
Leveling screws can be turned easily by tipping the
cabinet slightly.
Turn the leveling screws counterclockwise(
raise the unit, clockwise(
5.
Clean your fridge-freezer thoroughly and wipe off all
dust accumulated during shipping.
6.
Install accessories such as ice cube box, etc., in their
proper places. They are packed together to prevent
possible damage during shipment.
7.
Connect the power supply cord (or plug) to the
outlet. Don't double up with other appliances on the
same outlet.
When your fridge-freezer is installed, allow it 2-3 hours
to stabilize at normal operating temperature prior to
filling it with fresh or frozen foods.
If power plug is disconnected, allow 5 minutes delay
before restarting.
Your fridge-freezer is now ready for use.
32
) to
) to lower it.

Advertisement

Table of Contents
loading

Table of Contents