Extra Procedure for Combi Boilers

11-4

Baffle Positions

Fig. 11-4a Baffles Position
50/80I AND 50/80E
50/80I AND 50/80E
50/80I AND 50/80E
50/80I AND 50/80E
50/80I AND 50/80E
11-3.1 Cold Fill Pressure
Check the cold fill pressure is as recorded, reset the red pointer if required.
A drop in the cold fill pressure indicates that the system requires topping up. If regular
topping up is required it indicates that there may be a leak in the system. Refer to 6-2.2.
11-3.2 TPR Valve
Check as detailed in 6-2.5.
Baffles are fitted in the heat exchanger of Boilers, they provide optimum heat distribution
to maintain the Boiler efficiency.
When baffles are left out, wrongly positioned or excessively distorted, the Boiler
efficiency will be drastically reduced.
Baffles should be removed, cleaned and replaced during routine servicing.
Care should be taken when replacing baffles to ensure that they are correctly fitted. Fig.
11-4a shows the right and wrong way of fitting some baffles.
IMPORTANT
All baffles must be fitted.
All baffles must be correctly positioned.
Replace distorted baffles.
If baffles appear to be missing check they have not fallen to the bottom of
the heat exchanger during transit.
11-4.1 Wall Mounted and Free Standing External Boilers
Fig. 11-4b Wall Mounted and Free Standing External Boiler Baffle Positions
SERVICING
SERVICING
SERVICING
SERVICING
SERVICING
40/50I AND 40/50E
40/50I AND 40/50E
40/50I AND 40/50E
40/50I AND 40/50E
40/50I AND 40/50E
11
11
11
11
11
11 11
11 11
11
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents