Select and Option Internal Floor Standing

Note
For Boiler dimensions see Section 13.
Fig. 5-1a shows recommended access.
750
40/65
40/65
40/65
40/65
40/65
60/80
60/80
60/80
60/80
60/80
80/95
80/95
80/95
80/95
80/95
90/120
90/120
90/120
90/120
90/120
UNDER
WORKTOP
Fig. 5-1b Heating Connections
Fig. 5-1c Phial Positions
FIRE VALVE SENSOR
FIXED ABOVE BURNER
FLEXIBLE OIL PIPE ✓
SHUT OFF VALVE ✓
5-1.1 Service Access
Boiler Models 40/65, 60/80, 80/95 and 90/120 can have the heat exchanger serviced
from both the front or top of the Boiler. The Burner is serviced from the front.
Boiler Models 100/150, 140/190, 190/240 and
the heat exchanger. The Burner is serviced from the front.
750
40/65
40/65
40/65
40/65
40/65
60/80
60/80
60/80
60/80
60/80
80/95
80/95
80/95
80/95
80/95
90/120
90/120
90/120
90/120
90/120
FRONT
AND/OR
TOP (optional)
ACCESS
Fig. 5-1a Recommended Access

5-1.2 Heating Connections

The flow and return connections may be diagonally opposed to give maximum flow
through the Boiler but this is not essential for satisfactory operation.
If the design of the heating system calls for flow pipes smaller than the Boiler flow
tappings, the reduction of the outlets should be made by using excentric reducing
sockets to ensure that all air can vent from the top of the Boiler waterway.
5-1.3 Connecting Control Panel
Select and Option Boilers are despatched with the Control Panel fitted. The phials of the
two thermostats are inserted vertically into the pockets situated on either side on the top
of the Boiler heat exchanger, see fig. 5-1c.
The mains electricity supply, preferably from a spur switched and fused 5 amp socket
should enter the Boiler casing through one of the holes or knockouts provided.
A plug is provided for connection to the mains supply. The plug fits into the mains
connection on the underside of the Control Panel.
Select - The Burner has cable and plug that connects to underside of Control Panel.
Option - The Burner is prewired to the Control Panel.
5-1.4 Oil Connection
All Floor Standing Boilers are supplied with a pump set for single pipe oil system.
Fig. 5-1d Oil Connections
INST
INST
INSTALLA
INST
INST
ALLA
ALLA
ALLATION
ALLA
240/270
require top access for servicing
750
100/150,
100/150,
100/150,
100/150,
100/150,
140/190,
140/190,
140/190,
140/190,
140/190,
190/240
190/240
190/240
190/240
190/240
240/270
240/270
240/270
240/270
240/270
FRONT AND
TOP ACCESS
REQUIRED
(refer to wiring diagram)
SHUT OFF VALVE
FILTER ✓
✓ SUPPLIED WITH BOILER - SEE SECTION 13.