GAH S40/65 User Manual
GAH S40/65 User Manual

GAH S40/65 User Manual

Thermecon oil fired boiler
Table of Contents

Advertisement

CONTENTS
CONTENTS
CONTENTS
CONTENTS
CONTENTS
Section 1 User Information
Section 1 User Information
Section 1 User Information
Section 1 User Information
Section 1 User Information
1-1 Installer ---------------------------------------------------------- 2
1-2 Householders Information --------------------------------------- 2
1-3 Service History -------------------------------------------------- 2
1-4 Boilers covered by this manual ---------------------------------- 3
Section 2 Operator Controls
Section 2 Operator Contr
Section 2 Operator Contr
ols
ols
ols
Section 2 Operator Contr
Section 2 Operator Contr
ols
2-2 Control Panel - Option ------------------------------------------- 6
2-3 Combi Thermostatic Mixing valve ------------------------------- 7
2-4 Combi &Expansion Relief --------------------------------------- 7
Section 3 Boiler Operation
Section 3 Boiler Operation
Section 3 Boiler Operation
Section 3 Boiler Operation
Section 3 Boiler Operation
3-1 Switching the Boiler ON ----------------------------------------- 8
3-2 Switching the Boiler OFF ---------------------------------------- 8
3-3 Burner 'Lockout' ------------------------------------------------- 8
3-4 Care of the Boiler ------------------------------------------------ 9
Section 4 Installation General
Section 4 Installation General
Section 4 Installation General
Section 4 Installation General
Section 4 Installation General
4-1 Compliance --------------------------------------------------- 10
4-2 Siting and Positioning the Boiler ------------------------------ 10
Section 5 Installation
Section 5 Installation
Section 5 Installation
Section 5 Installation
Section 5 Installation
5-2 Select Internal Wall Mounted ---------------------------------- 12
5-3 Select External Wall Mounted --------------------------------- 14
5-4 Select Free Standing External ---------------------------------- 16
5-5 Option Floor Standing System Boiler - ------------------------ 18
Section 6 Installation Combistr
Section 6 Installation Combistr
Section 6 Installation Combistream and Combi 65
6-1 Combistream System and Combi 65 -------------------------- 21
Section 7 Oil Supply
Section 7 Oil Supply
Section 7 Oil Supply
7-1 Oil Storage Tanks ---------------------------------------------- 28
7-2 Oil System ----------------------------------------------------- 28
7-3 Oil Supply System --------------------------------------------- 29
Section 8 Conventional Flue
Section 8 Conventional Flue
8-1 Conventional Flue --------------------------------------------- 31
Section 9 Balanced Flue
Section 9 Balanced Flue
Section 9 Balanced Flue
Section 9 Balanced Flue
Section 9 Balanced Flue
9-1 Balanced Flue Selection --------------------------------------- 32
9-2 Suggested Flue Siting ----------------------------------------- 33
9-3 Burner Air Supply ---------------------------------------------- 34
Section 10 Commissioning
Section 10 Commissioning
Section 10 Commissioning
Section 10 Commissioning
10-1 Commissioning Checks --------------------------------------- 35
10-2 Extra Procedures for System Boilers --------------------------- 36
10-3 Extra Procedures for Combi Boilers ---------------------------- 36
10-4 Combustion Tests --------------------------------------------- 37
10-5 Handing Over -------------------------------------------------- 37
Section 11 Servicing
Section 11 Servicing
11-1 Routine Service ------------------------------------------------ 38
11-2 Extra Procedure for System Boilers ---------------------------- 38
11-3 Extra Procedure for Combi Boilers ----------------------------- 39
11-4 Baffle Positions ------------------------------------------------ 39
Section 12 Fault Finding
Section 12 Fault Finding
Section 12 Fault Finding
Section 12 Fault Finding
Section 12 Fault Finding
12-1 Householders Fault Finding ----------------------------------- 41
12-4 Engineers Fault Finding --------------------------------------- 42
Section 13 T T T T T echnical Information
echnical Information
echnical Information
echnical Information
echnical Information
13-1 Boiler Specifications ------------------------------------------ 44
13-2 Boiler Output Options ------------------------------------------ 45
13-3 Burner Setting Data -------------------------------------------- 45
13-4 Burner Settings ------------------------------------------------ 47
13-5 Panel Wiring Diagrams ---------------------------------------- 49
13-6 Parts Supplied with Boiler ------------------------------------- 52
13-7 Boiler Dimensions --------------------------------------------- 54
13-8 Balanced Flue Dimensions ------------------------------------ 59
Appendix
Appendix
Appendix
Appendix
Appendix
AP1 Regulations ---------------------------------------------------- BC
1 USER INFORMA
1 USER INFORMA
1 USER INFORMATION
1 USER INFORMA
1 USER INFORMA
2 OPERA
2 OPERA
TOR CONTROLS
TOR CONTROLS
2 OPERA
2 OPERATOR CONTROLS
2 OPERA
TOR CONTROLS
TOR CONTROLS
3 BOILER OPERA
3 BOILER OPERA
3 BOILER OPERATION
3 BOILER OPERA
3 BOILER OPERA
4 INST
4 INSTALLA
4 INST
ALLA
ALLATION GENERAL
ALLA
TION GENERAL
TION GENERAL
TION GENERAL
4 INST
4 INST
ALLA
TION GENERAL
5 INST
5 INST
5 INST
5 INST
5 INSTALLA
COMBISTREAM
COMBISTREAM
COMBISTREAM
COMBISTREAM
COMBISTREAM
6 INST
6 INSTALLA
6 INST
ALLA
ALLA
ALLATION
TION
TION
TION
6 INST
6 INST
ALLA
TION
7 OIL SUPPL
7 OIL SUPPLY Y Y Y Y
7 OIL SUPPL
7 OIL SUPPL
7 OIL SUPPL
8 CONVENTIONAL FL
8 CONVENTIONAL FLUE
8 CONVENTIONAL FL
8 CONVENTIONAL FL
8 CONVENTIONAL FL
9 BALANCED FL
9 BALANCED FLUE
9 BALANCED FL
9 BALANCED FL
9 BALANCED FL
10 COMMISSIONING
10 COMMISSIONING
10 COMMISSIONING
10 COMMISSIONING
10 COMMISSIONING
11 SERVICING
11 SERVICING
11 SERVICING
11 SERVICING
11 SERVICING
12 F
12 F
AUL
AUL
12 F
12 F
12 FAUL
AULT FINDING
AUL
13 TECHNICAL
13 TECHNICAL
13 TECHNICAL
13 TECHNICAL
13 TECHNICAL
INFORMA
INFORMA
INFORMATION
INFORMA
INFORMA
CONTENTS
CONTENTS
CONTENTS
CONTENTS
CONTENTS
TION
TION
TION
TION
TION
TION
TION
TION
ALLA
ALLA
TION
TION
ALLATION
ALLA
TION
TION
COMBI 65
COMBI 65
COMBI 65
COMBI 65
COMBI 65
UE
UE
UE
UE
UE
UE
UE
UE
T FINDING
T FINDING
T FINDING
T FINDING
TION
TION
TION
TION
APPENDIX
APPENDIX
APPENDIX
APPENDIX
APPENDIX
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the S40/65 and is the answer not in the manual?

Questions and answers

Darren Sturland
May 7, 2025

We have drained the system for new radiators and the boiler will not start. We have only recently moved to the property so we are unsure what we are doing. Model 60/80

1 comments:
Mr. Anderson
May 19, 2025

The GAH model 60/80 boiler may not start after draining the system for new radiators because the system pressure is likely too low. The pressure gauge should read between 1 and 2 bar. If it's lower, the boiler will not operate. Refill the system to the correct pressure to resolve the issue.

This answer is automatically generated

Summary of Contents for GAH S40/65

  • Page 1: Table Of Contents

    CONTENTS CONTENTS CONTENTS CONTENTS CONTENTS CONTENTS CONTENTS CONTENTS CONTENTS CONTENTS Section 1 User Information Section 1 User Information Section 1 User Information Section 1 User Information Section 1 User Information 1 USER INFORMA 1 USER INFORMA 1 USER INFORMATION TION TION TION 1 USER INFORMA...
  • Page 2: Installer

    DO NOT involve a third party that may incur you costs as this will not be covered by the Boiler Guarantee. Any work not authorised by GAH (HEATING PRODUCTS) LTD. may also invalidate the Guarantee. Work carried out and parts fitted by unauthorised engineers cannot be guaranteed.
  • Page 3: Boilers Covered By This Manual

    USER INFORMATION TION TION TION TION Boilers covered by this manual 1 1 1 1 1 Select Floor Standing My Boiler QUICK REFERENCE ✔ Tick box S40/65 S60/80 S80/95 S90/120 Wiring Model Dimensions Diagram Connection 40 to 65 60 to 80...
  • Page 4: Control Panel - Select And Combistream

    OPERA OPERA OPERATOR CONTROLS OPERA OPERA TOR CONTROLS TOR CONTROLS TOR CONTROLS TOR CONTROLS Control Panel - Select, Combistream and Combi 65 2 2 2 2 2 HIGH LIMIT THERMOSTAT MANUAL RESET (OPTIONAL) HINGED FLAP HELD CLOSED BY A PUSH OPEN - PUSH SHUT MAGNET Select and Internal Wall HIGH LIMIT THERMOSTAT MANUAL RESET (OPTIONAL)
  • Page 5 OPERA OPERA OPERATOR CONTROLS OPERA OPERA TOR CONTROLS TOR CONTROLS TOR CONTROLS TOR CONTROLS 2-1.2 Mains Switch O = Off I = On The Mains Switch switches the Boiler ON and OFF. When power to the Boiler is ON and the Mains Switch is ON the Mains Indicator Lamp will be lit.
  • Page 6: Control Panel - Option

    OPERA OPERA OPERATOR CONTROLS OPERA OPERA TOR CONTROLS TOR CONTROLS TOR CONTROLS TOR CONTROLS 2-1.8 Hot Water High Limit Thermostat With Manual Reset A Hot Water High Limit Thermostat with an integral Manual Reset button is fitted to the HOT WATER Boiler.
  • Page 7: Combi Thermostatic Mixing Valve

    OPERA OPERA OPERATOR CONTROLS OPERA OPERA TOR CONTROLS TOR CONTROLS TOR CONTROLS TOR CONTROLS Combistream and Combi 65 Thermostatic Mixing Valve The Mixing Valve will be positioned outside the Boiler case and may be in a different location than the Boiler. This valve mixes hot water from the Boiler with cold water to provide hot water of a constant temperature at the taps.
  • Page 8: Switching The Boiler On

    BOILER OPERA BOILER OPERA BOILER OPERA BOILER OPERA BOILER OPERATION TION TION TION TION Switching the Boiler ON To set Boiler for operation:- Select and Combi External Option Turn fuel supply on. Turn fuel supply on. Turn fuel supply on. Switch power supply to the Switch power supply to the Switch power supply to the...
  • Page 9: Care Of The Boiler

    BOILER OPERA BOILER OPERA BOILER OPERA BOILER OPERA BOILER OPERATION TION TION TION TION In the event of a ‘lockout’, wait 45 seconds and restart the Burner by pressing the Reset button. If lockouts are more than occasional, consult your service engineer as there may be a fault with the fuel supply or Burner.
  • Page 10: Compliance

    INST INST INST INST INSTALLA ALLA ALLA ALLA ALLATION GENERAL TION GENERAL TION GENERAL TION GENERAL TION GENERAL Compliance The Boiler and heating system must be installed to comply with the latest Building Regulations, British Standards and OFTEC recommendations, refer to the Appendix at the back of this book.
  • Page 11: Select And Option Internal Floor Standing

    INST INST INST INST INSTALLA ALLA ALLA ALLA ALLATION TION TION TION TION Select and Option Internal Floor Standing 5-1.1 Service Access Note Boiler Models 40/65, 60/80, 80/95 and 90/120 can have the heat exchanger serviced For Boiler dimensions see Section 13. from both the front or top of the Boiler.
  • Page 12: Select Internal Wall Mounted

    INST INST INST INST INSTALLA ALLA ALLA ALLA ALLATION TION TION TION TION Select Internal Wall Mounted - W40/50I & W50/80I 5-2.1 Service Access SERVICE DOOR Boilers have a quick release front panel enabling all routine servicing to be carried out without the necessity of removing any other panels.
  • Page 13 INST INST INST INST INSTALLA ALLA ALLA ALLA ALLATION TION TION TION TION 50 50 50 50 50 kg kg kg kg kg W W W W W ARNING ARNING ARNING ARNING ARNING The weight of the Boiler Heat Exchanger bare is 50kg (110 lbs) - it is a two person job to lift it in place.
  • Page 14: Select External Wall Mounted

    INST INST INST INST INSTALLA ALLA ALLA ALLA ALLATION TION TION TION TION 5-2.5 Oil Connections All Wall Mounted Boilers are supplied with a pump set for two pipe oil system. FIRE VALVE SENSOR FIXED ABOVE BURNER OIL HOSES ✓ NO VALVES IN FIRE VALVE RETURN LINE...
  • Page 15 INST INST INST INST INSTALLA ALLA ALLA ALLA ALLATION TION TION TION TION Note 5-3.4 Fixing the Boiler - Suggested Procedure Before removing main case, study the Remove carton. Burner position and the Boiler wall position Open Boiler door and remove flue components. and decide on the best oil pipe configuration, see Section 5-3.6 and Remove Control Panel by unplugging Burner plug and unbolt two nuts.
  • Page 16: Select Free Standing External

    INST INST INST INST INSTALLA ALLA ALLA ALLA ALLATION TION TION TION TION A 4 pin plug is provided for connection to the mains supply. This connects into the socket in the side of the Control Panel - for wiring see page 50, 5-3.6 Oil Connections All Wall Mounted Boilers are supplied with a pump set for two pipe oil system.
  • Page 17 INST INST INST INST INSTALLA ALLA ALLA ALLA ALLATION TION TION TION TION 5-4.4 Oil Connection Free Standing External Boilers are supplied with a pump set for single pipe oil system. The oil pipe and electric cable should also enter through the cut-outs provided in the bottom panel - see fig 5-4c.
  • Page 18: Option Floor Standing System Boiler

    INST INST INST INST INSTALLA ALLA ALLA ALLA ALLATION TION TION TION TION Option Floor Standing System Boiler - OS60/80, OS80/95, OS90/120, OS100/150 Note 5-5.1 Boiler Arrangement For:- OS80/95 SHOWN Service Access ....see 5-1.1 Heating Connections ... see 5-1.2 Connecting Control Panel ..
  • Page 19 INST INST INST INST INSTALLA ALLA ALLA ALLA ALLATION TION TION TION TION 5-5.5 Pressure Relief Valve The Pressure Relief Valve is provided to vent excess pressure from the system. The valve will open when the pressure exceeds 3 Bar ± 10%. The pressure relief valve can be manually opened by turning the red knob clockwise, to close the valve continue turning clockwise until it clicks.
  • Page 20 INST INST INST INST INSTALLA ALLA ALLA ALLA ALLATION TION TION TION TION 5-5.9 Wiring The wiring of the pump should be done by the installer to best suit the system timer/ programmer. IMPORTANT The pump MUST be wired so that it is ON at all times the Boiler is ON. PUMP ELECTRICAL CONNECTIONS LIMIT STAT CONTROL STAT...
  • Page 21: Combistream System And Combi

    INST INST INSTALLA INST INST ALLA ALLA ALLA ALLATION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 Combistream System and Combi 65 Note 6-1.1 The Combi Boiler Design For:-...
  • Page 22 INST INST INSTALLA INST INST ALLA ALLA ALLA ALLATION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 6-1.3 Combistream System Design 6 6 6 6 6 Fig.
  • Page 23: Combistream System And Combi 65 Components

    INST INST INSTALLA INST INST ALLA ALLA ALLA ALLATION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 Combistream System and Combi 65 Components 6-2.1 Accumulator (supplied with Combistream Only) The Accumulator may be installed at any convenient location within the dwelling,...
  • Page 24 INST INST INSTALLA INST INST ALLA ALLA ALLA ALLATION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 6-2.6 Heating Expansion Vessel Maximum working pressure 3Bar Maximum charge pressure...
  • Page 25 6-2d. builders and plumbing merchants or from GAH. When a water softener is fitted, the Cleanstream unit should not be necessary. To enable cartridge change, a servicing valve should be fitted to the inlet side of the unit, a non-return valve is included in the outlet of the unit - see fig.
  • Page 26: Combistream And Cobi 65 Connections To The Boiler

    INST INST INSTALLA INST INST ALLA ALLA ALLA ALLATION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 6-2.12 Hot Water TPR Discharge Tundish One Tundish is supplied with the Boiler, this should be fitted to the hot water TPR valve discharge pipe at the right hand side of the Boiler.
  • Page 27 INST INST INSTALLA INST INST ALLA ALLA ALLA ALLATION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 TION - COMBISTREAM & COMBI 65 6-3.2 Thermostatic Mixing Valve Notes A Thermstatic Mixing Valve is supplied with the Combistream system and the Combi 65.
  • Page 28: Section 7 Oil Supply

    OIL SUPPL OIL SUPPL OIL SUPPLY OIL SUPPL OIL SUPPL Oil Storage Tanks 7-1.1 Size and Siting of Tank The size and site of the tank should be chosen to be least obtrusive with consideration to Notes the following:- Check with oil supplier for access Access for fuel delivery vehicles.
  • Page 29: Oil Supply System

    OIL SUPPL OIL SUPPL OIL SUPPLY OIL SUPPL OIL SUPPL 7-2.2 Oil Supply Pipe In ALL oil systems the vertical lift of the oil line should be 10mm diameter. Horizontal runs should also be 10mm diameter, however it is good practice to use 15mm diameter, on the horizontal sections only, of pipe runs longer than 40 metres.
  • Page 30: Two Pipe System

    OIL SUPPL OIL SUPPL OIL SUPPLY OIL SUPPL OIL SUPPL 7-3.3 Single Pipe System - Deaerator (Tigerloop) When the Burner is over 1 metre above the tank the installation normally requires a two Note pipe system, however, a ‘Tigerloop’ deaerator can be used which removes air from a Tigerloops are available from your merchant.
  • Page 31: Section 8 Conventional Flue

    CONVENTIONAL FL CONVENTIONAL FL CONVENTIONAL FL CONVENTIONAL FL CONVENTIONAL FLUE Conventional Flue Note All Floor Standing Boilers are supplied with an adaptor and flexible air duct fitted for The chimney must comply with current conventional flue connection. Building Regulations, and BS5410 Part 1. BS4543 applies to Factory Made Insulated Chimneys, see Parts 2 and 3.
  • Page 32: Balanced Flue Selection

    O100/150, O140/190, O190/240 S240/270 and O240/270 FLOOR STANDING S100/150, S140/190, S190/240 only Low Level Rear is available - LLR125 O40/65, O60/80, O80/95, O90/120, WALL MOUNTED W40/50I, W50/80I S40/65, S60/80, S80/95, S90/120, C40/65 Combi 75mm 75mm 100mm Rear Low Level Rear AØ AØ...
  • Page 33: Suggested Flue Siting

    BALANCED FL BALANCED FL BALANCED FL BALANCED FL BALANCED FLUE Suggested Flue Siting CLOSER THAN 750 Fig. 9-2a Suggested Flue Siting 9-2.1 Positioning Balanced Flues Fig. 9-2a and the table below shows recommended clearances when siting balanced flues for oil. Directly below an opening, airbrick, opening window etc.
  • Page 34: Burner Air Supply

    BALANCED FL BALANCED FL BALANCED FL BALANCED FL BALANCED FLUE Burner Air Supply 9-3.1 Combustion Air Supply Boiler in room. No combustion air inlet is required. Boiler in compartment/small room. Ventilation air supply is required as shown in fig. 9-3a. OFTEC INFORMATION SUPPLIED BY OFTEC.
  • Page 35: Section 10 Commissioning

    COMMISSIONING COMMISSIONING COMMISSIONING COMMISSIONING COMMISSIONING 10-1 Commissioning Checks It is recommended that an O.F.T.E.C. trained and registered technician be used. It is the responsibility of the installer to ensure that the Boiler is properly commissioned, see BS5410 Part 1. 10-1.1 Oil Tank and Supply Line The tank and supply pipe installation should comply with the details shown in Section 7 of this manual.
  • Page 36: Extra Procedures For System Boilers

    COMMISSIONING COMMISSIONING COMMISSIONING COMMISSIONING COMMISSIONING 10-1.5 Conventional Flue and Chimney Check that the chimney has been lined/insulated to prevent condensation, is of the correct size and has no obstructions to restrict the flow of gases. Check that the flue is of the same diameter for its entire length. A flue that steps from one size to another will affect the draw of air resulting in inefficient Burner operation or Burner malfunction.
  • Page 37: Combustion Tests

    10-5 Handing Over Having filled in the guarantee form, this should be sent to GAH (Heating Products) Limited. The installer should next recheck the system and ensure it is completely satisfactory before demonstrating to the householder the operation of the Boiler and its controls.
  • Page 38: Section 11 Servicing

    SERVICING SERVICING SERVICING SERVICING SERVICING 11-1 Routine Service FUEL FUEL FUEL FUEL FUEL 28 Second Class C K 28 Second Class C K 28 Second Class C K 28 Second Class C Ker er er er erosene - ONCE A YEAR. 28 Second Class C K osene - ONCE A YEAR.
  • Page 39: Extra Procedure For Combi Boilers

    SERVICING SERVICING SERVICING SERVICING SERVICING 11-3 Extra Procedure for Combi Boilers 11-3.1 Cold Fill Pressure Check the cold fill pressure is as recorded, reset the red pointer if required. A drop in the cold fill pressure indicates that the system requires topping up. If regular topping up is required it indicates that there may be a leak in the system.
  • Page 40 SERVICING SERVICING SERVICING SERVICING SERVICING 11-4.2 Floor Standing Boilers S40/65 S40/65 S40/65 S40/65 S40/65 S60/80 S60/80 S60/80 S60/80 S60/80 O60/80 O60/80 O60/80 O60/80 O60/80 C40/65 C40/65 C40/65 S80/95 S80/95 S80/95 O80/95 O80/95 O80/95 C40/65 C40/65 S80/95 S80/95 O80/95 O80/95 O40/65...
  • Page 41: Householders Fault Finding

    T FINDING 12-1 Householders Fault Finding - also see www.gah.co.uk IMPORTANT If you have not been able to rectify the problem contact the INSTALLER who will advise you further. Do not involve a third party that may incur you costs as this will not be covered by the Boiler Guarantee and any work not authorised by the manufacturer may also invalidate the Guarantee.
  • Page 42: Engineers Fault Finding

    F F F F F AUL AULT FINDING T FINDING T FINDING T FINDING T FINDING 12-4 Engineers Fault Finding - also see www.gah.co.uk i t u , s n i l t o r t . l e f I . g i l...
  • Page 43: Engineers Fault Finding - System Boilers

    F F F F F AUL AULT FINDING T FINDING T FINDING T FINDING T FINDING i t u t a h l l a i t s e r a e r r . y l f i t l i o l e v l a f...
  • Page 44: Boiler Specifications

    TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMATION TION TION TION TION 13-1 Boiler Specifications l l a t n u l l a t n u i d n r e t l a n e e r i d n r e t l a n...
  • Page 45: Boiler Output Options

    TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMATION TION TION TION TION 13-2 Boiler Output Options a l f M x a M x a M x a M x a M x a M x a M x a M x a M x a M x a...
  • Page 46 TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMATION TION TION TION TION 13-3.2 Floor Standing SELECT & OPTION Range Factory Setting l F e u l F e u l F e u l F e u i t s i t s i t s i t s...
  • Page 47: Burner Settings

    TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMATION TION TION TION TION 13-4 Burner Settings 13-4.1 Combustion Air Setting - Minor Series Burners MINOR 1 BURNER SHOWN Note LOOSEN BOLT AND SLIDE ADJUSTMENT The recommended settings for the (SPANNER SUPPLIED) combustion head and combustion air are shown on pages 45 &...
  • Page 48 TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMATION TION TION TION TION 13-4.5 Combustion Air Setting - Max Series Burners Note The recommended settings for the LOCK SCREW X 2 combustion head and combustion air are shown on pages 45 & 46. Settings should not differ greatly from the settings given.
  • Page 49 TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMATION TION TION TION TION CAUTION 13-4.6 Burner Oil Pressure Only fit and remove The Burner pump oil pressure is measured using a pressure gauge fitted into the bleed/ pressure gauge when pressure gauge port of the pump.
  • Page 50: Panel Wiring Diagrams

    TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMATION TION TION TION TION 13-5 Panel Wiring Diagrams 13-5.1 Floor Standing SELECT and Wall Mounted Internal REMO EMOVE MAINS PL VE MAINS PL VE MAINS PL VE MAINS PL VE MAINS PLUG BEFORE UG BEFORE UG BEFORE UG BEFORE...
  • Page 51 TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMATION TION TION TION TION 13-5.3 Wall Mounted and Free Standing External Range 13 13 13 13 Fig. 13-5c Wiring Diagram for Wall Mounted and Free Standing External...
  • Page 52 TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMATION TION TION TION TION 13-5.4 Combistream and Combi 65 Internal Wiring Diagram 13 13 13 13 Fig. 13-5d Combistream and Combi 65 Internal Wiring Diagram...
  • Page 53 13-5.4 Combistream and Combi 65External Wiring Diagram 13 13 13 13 Fig. 13-5e Combistream and Combi 65 External Wiring Diagram...
  • Page 54: Parts Supplied With Boiler

    TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMATION TION TION TION TION 13-6 Parts Supplied with Boiler 13-6.1 SELECT and OPTION Floor Standing e t I t r a t s n l l a i t a a r t l i a a r t...
  • Page 55 TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMATION TION TION TION TION 13-6.3 COMBISTREAM and COMBI 65 e t I t r a r t s r t s r t s r t s r t s t s n l l a i t a...
  • Page 56: Boiler Dimensions

    TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMATION TION TION TION TION 13-7 Boiler Dimensions 13-7.1 SELECT and OPTION Range SOCKET FOR CONVENTIONAL FLUE not 190/240 & 240/270 Conduit Knockout CABLE ENTRY In one Blanking Plate Thermecon FLOW RETURN F.F.L.
  • Page 57 TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMATION TION TION TION TION 13-7.2 W40/50I & W50/80I - INTERNAL FULLY PUMPED SYSTEMS ONLY ALL DIMENSIONS ARE NOMINAL RETURN - 1” BSP FLOW - 1” BSP plan Ø125 Vertical Balanced Flue RETURN FLOW R - 3 Mounting Holes 12Ø...
  • Page 58 TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMATION TION TION TION TION 13-7.3 W40/50E & W50/80E - EXTERNAL FULLY PUMPED SYSTEMS ONLY ALL DIMENSIONS ARE NOMINAL RECOMMENDED PIPE ARRANGEMENT R - 3 Mounting Holes 12Ø for M10 Rawl Bolts FLOW - 1”...
  • Page 59 TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMATION TION TION TION TION 13-7.4 Free Standing EXTERNAL Dimensions FULLY PUMPED SYSTEMS ONLY ALL DIMENSIONS ARE NOMINAL / 7 . / 7 . r e t r t i l 4 Holes 12Ø...
  • Page 60 TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMATION TION TION TION TION 13-7.5 Floor Standing Combistream and Combi 65 Internal Dimensions FULLY PUMPED SYSTEMS ONLY ALL DIMENSIONS ARE NOMINAL SOCKET FOR CONVENTIONAL FLUE HOT WATER FLOW 22mm Thermecon HOT WATER TPR 15mm HEATING TPR...
  • Page 61 13-7.6 Floor Standing Combi 65 External Dimensions FULLY PUMPED SYSTEMS ONLY ALL DIMENSIONS ARE NOMINAL HOT WATER FLOW 22mm HOT WATER TPR 15mm HEATING TPR HEATING DISCHARGE FLOW 15mm 1” BSP HEATING COLD FEED TO RETURN BOILER 22mm 1” BSP F .F .L.
  • Page 62: Balanced Flue Dimensions

    TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMATION TION TION TION TION 13-8 Balanced Flue Dimensions 13-8.1 Floor Standing Internal inc. Combi - HIGH LEVEL SIDE & REAR FLUES CANNOT BE CUT TO LENGTH TERMINAL GUARD (option) PLAN PLAN Minimum Minimum...
  • Page 63 TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMATION TION TION TION TION 13-8.2 Floor Standing Internal inc. Combi - REAR TELESCOPIC EXTENSIONS AVAILABLE FLUES CANNOT BE CUT TO LENGTH Minimum PLAN ØA F.F.L. SELECT & OPTION RANGE - SELECT SHOWN t e l Ø...
  • Page 64 TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMATION TION TION TION TION 13-8.4 Floor Standing Internal inc. Combi - VERTICAL TELESCOPIC EXTENSIONS AVAILABLE FLUES CANNOT BE CUT TO LENGTH Ø200 e t x t e l Ø i t r l a c l i a x o r...
  • Page 65: Section 6 Installation Combistr Eam And Combi

    TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMATION TION TION TION TION 13-8.5 Wall Mounted Internal - REAR TELESCOPIC EXTENSIONS AVAILABLE 300MM Standard Kit FLUES CANNOT BE CUT TO LENGTH 170 to 360 WHL075 Ø100 TERMINAL TRIM PLATE BOILER TERMINAL GUARD (option)
  • Page 66 TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMATION TION TION TION TION 13-8.7 Wall Mounted Internal - VERTICAL EXTENSIONS AVAILABLE 300mm, 600mm and 950mm FLUES CANNOT BE CUT TO LENGTH l l a r e t l a n t i K h t i t i K...
  • Page 67 TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMA TECHNICAL INFORMATION TION TION TION TION 13-8.8 Combistream and Combi 65I - REAR SIDE TELESCPIC EXTENSIONS AVAILABLE 300mm, 600mm and 950mm FLUES CANNOT BE CUT TO LENGTH t i K h t i e t x i s n e t x...
  • Page 68: Ap1 Regulations

    APPENDIX APPENDIX APPENDIX APPENDIX APPENDIX Regulations AP1-1 Building Regulations The following Standards and Codes of Practice should be considered when installing Thermecon Boilers. BS5449 - 1990 Forced Circulation Hot Water Central Heating Systems for Domestic Use. BS5410 Part 1:1977 Oil installations up to 45kW BS5410 Part 2:1978 Oil installations over 45kW BS4543 Part 1 &...
  • Page 69 7. Under no circumstances should mineral oils be taken internally - never suck or blow a pipe! In pursuance of a policy of constant development, GAH Heating Products Limited reserve the right to change any boiler part or design without notice, therefore certain...

Table of Contents

Save PDF