Si Vincenne Replacement; Si Emma 3 Important Start-Up Operation, Si New Software - Sony Ericsson K800 Electrical Repair Manual

Hide thumbs Also See for K800:
Table of Contents

Advertisement

SI - Vincenne replacement for SL4 and SL5
This document is applicable for
SL4 and SL5 centers with access to:
ROP1013057/1 ASIC Vincenne
ROP1013057/2 ASIC Vincenne Leadfree
ROP1013057/3 ASIC Vincenne Leadfree
ROP1013066/2 PROD. ADAPT. CIRCUIT/ASIC Vincenne2 A07
ROP1013066/5 ASIC, Vincenne2 A07 Cu-Plug Thin Ni (Pb-
ROP1013066/6R1A ASIC Vincenne2 A07 1.8V Cu-Plu
Description:
Vincenne 2 is now available again as spare part for level 4. After you have replaced
Vincenne, you MUST do a Vincenne calibration with the new "Vincenne calibration
tool"
After the Vincenne calibration in "Vincenne calibration tool" you MUST do a
normal SERP (RF calibration) in order to avoid a high re-repair rate and bad quality
perception of the product.
Failing to do the mandatory calibration correctly will result in that the access to
Vincenne will be permanently withdrawn for the service center.
System Requirements
At least a Pentium III 500 MHz, with 128 MB of RAM
Win2000 or Win XP
One free USB connector
At least 1024x768 display resolution. (1152x864 is recommended.)
SEPI interface must be installed.
SEPI A1 Cable
Dummy battery
CST-60 Charger
CST-75 Charger cable (customized according instruction)
One dual or two single Channel Power Supplies. (Equipment Setup.)
Software is found in CSPN under "Repair Instructions>Standard>VINCENNE
CALIBRATION TOOL 20/031 62-2/FEA 209 544/755 ". In the zip-package there are
also installation instructions. Instructions on how to use the tool are found under the
menu Help in the Vincenne calibration tool (also attached below). Important: Make
sure you connect the CST-75 Charger cable according instructions, i.e. between the
Phone and the SEPI A1 cable and not in the SEPI A1 cable!!
Reference number: 15382-61799
Created: 2007-05-15
Author:
Patrik Cesar (patrik.cesar@ecs.ericsson.se)
APPENDIX
SI Vincenne Replacement - Emma 3 Important Start-Up Operation
SI-EMMA 3 IMPORTANT Start-up operation
K800, K790, K610, V630, K618
In order to get the important pre-confi guration on units made before 06W42 you should
press "5" fi rst, keep it pressed and then press the "2" and keep it pressed. Thereafter while
pressing "2" and "5", you attach the USB cable. Keep the buttons pressed until there is a
message appearing in Emma III (This will fi x some of the "dead" or "white screen" units)
Reference number: 15177-60248
Created: 2007-03-19
Author:
Patrik Cesar (patrik.cesar@ecs.ericsson.se)
SI-New software R8BA024
Applicable for K810, K818
Note: No more general releases planned for K800, K790
(i.e. no default update of all those DPY / SI that doesn't require a Operator Acceptance).
Information
New and improved software R8BA024 for K810, K818 is about to be released on EMMA
III.
Due to the number of models and kits that are affected there will be a transition period
until all of the scripts are updated. We will start the release 07w44 and we estimate to
have fi nalised the work during 07w47.
For those DPY / SI with operator acceptance, the release date will depend on the approv-
al from the operator.
Reference number: 15805-65184
Created: 2007-10-31
Author:
Patrik Cesar (patrik.cesar@ecs.ericsson.se)
SEMC Electrical Repair Manual
K800 - K810
1202-3085 rev. 2
120
(121)

Advertisement

Table of Contents
loading

This manual is also suitable for:

K810

Table of Contents